Legislation Details

File #: 24-3837    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 6/13/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request for approval of an award on the basis of only responsive bid to Epoxy Design Systems, Inc. for concrete repairs at the Washburn Tunnel for Harris County Toll Road Authority for the period of August 1, 2024 - July 31, 2025, with four (4) one-year renewal options in the amount of $862,795.00 and for the County Clerk to execute any applicable bonds to be received (240012) (Precinct 2). MWDBE Contracted Goal: 20%.

Department: Toll Road Authority

Department Head/Elected Official: Roberto Treviño, P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 240012

Vendor/Entity Legal Name (if applicable): Epoxy Design Systems, Inc.

 

MWDBE Contracted Goal (if applicable): 20%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of only responsive bid to Epoxy Design Systems, Inc. for concrete repairs at the Washburn Tunnel for Harris County Toll Road Authority for the period of August 1, 2024 - July 31, 2025, with four (4) one-year renewal options in the amount of $862,795.00 and for the County Clerk to execute any applicable bonds to be received (240012) (Precinct 2). MWDBE Contracted Goal: 20%.

end

 

Background and Discussion:

On February 27, 2024, Commissioner’s Court approved the advertisement for concrete repairs at the Washburn Tunnel. Re-occurring inspections of the Washburn Tunnel are performed by TxDOT and HCTRA’s engineering consultants and generate inspection reports that contain issues that need to be addressed. These repairs will address items identified from inspection reports.

 

Expected Impact:

This project will repair concrete cracks and spalling of the tunnel liner, masonry brick, and other related concrete items at the Washburn Tunnel to ensure continued proactive maintenance of HCTRA’s infrastructure.

 

Alternative Options:

No other recommended solution for this identified need.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

2/27/2024

152

Approval for advertisement to obtain construction bids for concrete repairs at the Washburn Tunnel (Precinct 2).

 

Location: Washburn Tunnel

Address (if applicable): 3100 Federal Road, Houston, Texas 77015

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Washburn Tunnel operations and maintenance

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Revenue - TRA

$

$143,799.17

$

$862,795.00

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$143,799.17

$

$862,795.00

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$143,799.17

$

$862,795.00

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

 

Anticipated Implementation Date (if different from Court date): Notice to proceed pending approval of contract award and receipt of applicable bonds

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority

 

Attachments (if applicable): N/A