Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): L100-00-00-E001
Vendor/Entity Legal Name (if applicable): GC Engineering, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report by GC Engineering, Inc., dated November 7, 2022, and titled Little Cypress Creek Channel Improvements from Confluence of Units L100-00-00 and K100-00-00 to Telge Road Crossing (Cypress Creek and Little Cypress Creek Watersheds, Bond ID F-26, Project ID L100-00-00-E001, Precinct 3).
end
Background and Discussion:
The purpose of this transmittal is to approve the Preliminary Engineering Report (PER) that was to examine potential design alternatives for the Little Cypress Creek Channel Improvements from the Confluence of Units L100-00-00 and K100-00-00 to Telge Road Crossing project. This project will add channel capacity to provide water surface elevation reduction within the Little Cypress Creek watershed. Supporting design information collected as part of the PER includes topographic survey of the basin and channels in the study area, geotechnical investigation, landscape architectural conceptual design, jurisdictional wetland delineation, cultural resources, ordinary high water mark determination, water quality, Section 404 Individual Permit application with the USACE, geomorphic assessment, and natural stable channel design verification.
Expected Impact:
The acceptance of this PER will allow the Flood Control District to move into the engineering stage of this project, when funding is available. In the engineering stage, Flood Control District staff will manage the engineering consultant to finalize the design of the project and publicly bid for construction through Harris County Purchasing
Alternative Options:
The alternative should this PER not be approved is that the Flood Control District will not be able to proceed to the design phase of our project lifecycle.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
12/28/2018 |
2.b.5 |
ATN |
|
05/14/2019 |
2.a.8 |
Agreement |
Location: Along L100-00-00 between Telge Road and the confluence of L100-00-00 with K100-00-00
Address (if applicable):
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 4/16/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Map