Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom Ramsey
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN - 23103MF2Q701
Vendor/Entity Legal Name (if applicable): HR Green, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by HR Green Inc., for Hufsmith-Kohrville Road Segment 3B - from 400' north of Boudreaux Road to 600' north of Holderrieth Road - 2015, UPIN 23103MF2Q701, Precinct 3.
end
Background and Discussion:
This project consists of upgrading Hufsmith-Kohrville Road to a standard four (4) lane concrete boulevard in 100-foot ROW with a 32-foot raised median and underground storm sewer system for the updated limits from 400' north of Boudreaux Road to 600' north of Holderrieth Road. The project includes a new bridge across Willow Creek M100 channel and sidewalks.
Expected Impact:
The project will improve the north-south vehicular mobility for the local community. The proposed bridge will expand the entire channel, and the proposed elevation will reduce the bridge flooding.
Alternative Options:
Without this project, this road segment will continue operating under the current conditions without the improved 4 lane configuration.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
10/14/2014 |
p.9 1.e.3.g |
Recommendation for authorization to negotiate with: HR Green, Inc., for engineering services in connection with road improvements to Hufsmith-Kohrville Road, Segment 3 from north of Ezekiel Road to north of Holderrieth Road in Precinct 4 (UPIN 15104M23NP03). |
9/27/2016 |
p. 4 1.k |
Recommendation that the court approve a study report prepared by HR Green, Inc., for roadway improvements to Hufsmith-Kohrville Road from north of Ezekiel Road to north of Holderrieth Road in Precinct 4, and that the consultant be authorized to proceed with the design phase (UPIN 15104M23NP03). |
7/19/2022 |
84 |
Request for approval to negotiate with HR Green, Inc. for Professional Engineering Services in connection with Hufsmith-Kohrville Road Segment 3B - from approximately 400’ north of Boudreaux Road to 600’ north of Holderrieth Road, Precinct 3. |
Location: Hufsmith-Kohrville Rd & Boudreaux Rd, Tomball, Texas 77375
Address (if applicable): N/A
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$ |
$ |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$ |
$ |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 6/12/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Study Report