Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): 25090MF3N201
Vendor/Entity Legal Name (if applicable): Not applicable
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request that the County Judge execute a Correction Warranty Deed for Harris County Flood Control District for the public project known as Vince Bayou Channel Conveyance Improvements - I100-00-00-E001, tract number I100-00-00-06-058.0, UPIN 25090MF3N201, Precinct 2.
end
Background and Discussion:
The project consists of construction of two detention basins as well as channel modifications at each detention basin location along I100-00-00; These detention basins and channel improvements will increase storage flood volume reduce flooding within the watershed and is phase 1 of the ultimate project recommended in the feasibility study.
The wrong grantee’s designation was inadvertently recorded with the original general warranty deed. In order to correct this action, a correction deed prepared by the CAO must be executed by the County Judge.
Expected Impact:
The recommended project will reduce damages for approximately 2 structures from flooding and remove 14 from within the 100-year floodplain layer as well as add approximately 69 ac-ft of additional detention storage for the 100-yr storm event.
Alternative Options:
The alternative to approving this item would be to deny this request which will delay progress on this project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H2: Evaluate the feasibility and potential impacts of substantial, large-scale flood mitigation measures to provide equitable and transformational regional benefits.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
3/22/2022 |
108 |
Authorization to Negotiate |
|
11/15/2022 |
143 |
Contract Award |
|
11/12/2024 |
118 |
Public Necessity |
Location:
Address (if applicable): 0 Fairmont Parkway Pasadena, TX 77504
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 4/16/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Dr. F. Mike Etienne, Chief of Planning and Development Services, Office of the County Engineer
Attachments (if applicable): Correction Warranty Deed; Metes & Bounds