Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): W140-00-00-X013
Vendor/Entity Legal Name (if applicable): Greater Houston Construction
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a certificate of substantial completion with Greater Houston Construction, for concrete channel lining repairs (Buffalo Bayou Watershed, Bond ID CI-018, Project ID W140-00-00-X013, Job No. 25/0066, Precinct 3).
end
Background and Discussion:
This project consists of concrete channel lining repairs of Spring Branch Creek from Bracher Street to Pech Road. Work includes removal and replacement of sections of the concrete channel lining and low flow wall sections, including bottom concrete, cleaning, and sealing existing concrete joints, filling voids underneath and behind existing concrete lining and low flow wall sections, removal of silt deposits on the existing concrete lining, and reworking of the existing weep holes, including cleaning the existing weep holes and installing special maintainable weep hole filters. The overall objective of this work is to extend the useful life of the existing concrete paving in this channel section. Aguirre & Fields, LP is the designated design consulting firm for this project. The project consists of design and construction on Flood Control District property, within Precinct 3 and within City of Houston (COH) limits. The project is in Spring Branch Creek from Bracher Street to Pech Road. This creek provides stormwater drainage for the Spring Branch and Spring Valley Village area and conveys it to Buffalo Bayou. An inspection performed in 2019 revealed damage to the concrete at many expansion joints, voids beneath the concrete, and damaged outfalls. This project is intended to repair these items and restore the channel to the original condition.
Expected Impact:
Substantial Completion signifies that a flood control project is largely finished, allowing the Flood Control District to begin using most of the infrastructure to realize intended flood risk reduction benefits while the Contractor completes any applicable minor outstanding details.
Alternative Options:
There is no viable alternative to accepting substantial completion when a Contractor successfully completes the work scope of a contract.
County Strategic Plan Goal: N/A
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location: N/A
Address (if applicable):
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/19/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Certificate of Substantial Completion and Map