Legislation Details

File #: 24-6565    Version: 1 Name:
Type: Report Status: Agenda Ready
File created: 10/14/2024 In control: Commissioners Court
On agenda: 10/29/2024 Final action: 10/29/2024
Title: Request for approval of a Study Report prepared by Scientech Engineers, Inc., for Roadway - Reconstruction of Navigation Boulevard from Lockwood Drive to Mack Street 2021, UPIN 22102MF2D601, Precinct 2.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): UPIN 22102MF2D601

Vendor/Entity Legal Name (if applicable): Scientech Engineers, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of a Study Report prepared by Scientech Engineers, Inc., for Roadway - Reconstruction of Navigation Boulevard from Lockwood Drive to Mack Street 2021, UPIN 22102MF2D601, Precinct 2.

end

 

Background and Discussion:

The project is located in the City of Houston limits and is a joint participation project with Buffalo Bayou Partnership. Scientech Engineers, Inc. was awarded a contract to provide a Corridor Study to investigate the addition of a mixed use trail/bikeway along Navigation Boulevard from Lockwood Drive to Mack Street. Based on that agreement, Scientech has submitted the final study report on September 3rd, 2024.

 

Expected Impact:

The project will convert one existing travel lane in each direction on Navigation Boulevard to be able to provide for a wider center median which will provide for a new 12 feet dedicated bike and pedestrian route, thereby improving access to transit. It will include the addition of new six (6) feet sidewalks on both the north and south side of Navigation Boulevard, new Signal at Mac Farland and Navigation and partial augmentations to existing storm sewers and inlets to improve the drainage.

 

Alternative Options:

The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/08/2022

22-0838

Authorization to Negotiate - Scientech Engineers, Inc.

09/27/2022

22-5885

Award for Professional Engineering Services

 

Location: Navigation Boulevard from Lockwood to Mack Street

Address (if applicable): N/A

Precinct(s): Precinct 2                     

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

          $

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

          $

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: October 29, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): N/A