Legislation Details

File #: 26-5863    Version: 1 Name:
Type: Interlocal Agreement Status: Agenda Ready
File created: 9/2/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Request for approval to execute an Interlocal Agreement with the City of Houston for property dedication, construction, and maintenance in connection with Lockwood Overpass Parking Lot & Improvements, Crites St to Buffalo Bayou underneath Lockwood along proposed Foley St., UPIN 21102MF1SM01, Precinct 2.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): UPIN 21102MF1SM01

Vendor/Entity Legal Name (if applicable): City of Houston

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an Interlocal Agreement with the City of Houston for property dedication, construction, and maintenance in connection with Lockwood Overpass Parking Lot & Improvements, Crites St to Buffalo Bayou underneath Lockwood along proposed Foley St., UPIN 21102MF1SM01, Precinct 2.

end

 

Background and Discussion:

In 2022, Harris County entered into a Tri-Party agreement with the City of Houston and the Buffalo Bayou Partnership for the development, construction, and maintenance of the Buffalo Bayou East Project. The Lockwood Drive project, a cost-sharing collaboration between Harris County, the City of Houston, and the Buffalo Bayou Partnership, aims to enhance vehicle and pedestrian mobility while supporting the ongoing residential and recreational developments along Buffalo Bayou. This regional master plan will increase safety and accessibility through the construction of new roads, sidewalks, traffic signals, parking facilities, and trail connections, benefiting the community and boosting future growth. The City of Houston will pay an estimated City Funding Amount of $353,230.00 for site preparation, earthwork, paving, traffic control, and street lighting, and will grant a Temporary Construction Easement on City Rights-of-Way. Upon project completion, a reciprocal land exchange will occur where Harris County transfers Parcel 4 to the City and the City transfers Parcel 3 to the County in compliance with Chapter 272 of the Texas Local Government Code.

 

Expected Impact:

The project is expected to improve traffic flow and reduce congestion by adding new road connections and a signalized intersection. It will enhance pedestrian safety and mobility with the addition of sidewalks, trails, and lighting. The new parking area under the Lockwood Bridge will provide convenient parking and better utilize existing space. Furthermore, the installation of a stormwater system will improve drainage and mitigate flood risks. Overall, the project will create a safer, more accessible, and better-connected environment for residents and visitors. Upon completion of construction, the City of Houston will assume full responsibility for the operation, maintenance, and repair of the completed infrastructure, including Marron Park Way, Maplewood St., and the Lockwood intersection, ensuring Harris County will not be responsible for any future maintenance of the Real Estate.

 

Alternative Options:

No alternative options as the Project is already ongoing.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 601 Lockwood Dr, Houston, TX 77011

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$4,088,075.00

$4,088,075.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$4,088,075.00

$4,088,075.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$4,088,075.00

$4,088,075.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/17/2026

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM Chief of Engineering and Architectural Services

 

Attachments (if applicable): Interlocal Agreement