File #: 25-0069    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 12/22/2024 In control: Commissioners Court
On agenda: 1/9/2025 Final action: 1/9/2025
Title: Request for approval of a change in contract with SER Construction Partners, LLC, in connection with Holderrieth Road Drainage Improvements Project, with an addition in the amount of $58,664.19, Job No. 22/0369-15, UPIN 18104MF0R901, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 49.76%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable):  Job No. 22/0369, UPIN 18104MF0R901

Vendor/Entity Legal Name (if applicable): SER Construction Partners, LLC

 

MWBE Contracted Goal (if applicable): 27%

MWBE Current Participation (if applicable): 49.76%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with SER Construction Partners, LLC, in connection with Holderrieth Road Drainage Improvements Project, with an addition in the amount of $58,664.19, Job No. 22/0369-15, UPIN 18104MF0R901, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 49.76%.

end

 

Background and Discussion:

 

This project includes the reconstruction of Holderrieth Road from State Highway 249 to 850 feet west of Hufsmith-Kohrville Road.  Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32-foot raised median.

 

Temporary modification to the traffic signal was required to allow for the signal heads to better align with the traffic pattern.  Also, the proposed solution of removing and relocating of fence will eliminate the installation of extended curb and 6" sidewalk. This change will save significant amount to Harris County. This change order is intended to compensate the contractor for the additional work. 

 

New Items

 

TEMPORARY SIGNAL MODIFICATION AT SH249 (LS)                                                                                                                              $12,173.06

REMOVE AND REPLACE EXISTING FENCE (LS)                                                                                                                                                   $46,491.13

Expected Impact:

This change in contract allows the contractor to be appropriately compensated for the additional cos and time.

 

Alternative Options:

An alternative was to proceed with the original design, but that would be significantly more costly for Harris County.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

07/11/2017

1.f.5

Execute agreements/amendments with I.S. Engineers, LLC

02/11/2020

1.m.2

Approve study reports

05/19/2020

1.d.8

Authorization to acquire 37 tracts

05/19/2020

1.u

Approve the name change

09/29/2020

1.a.2

Authorization to purchase tract 17

10/27/2020

1.a.2

Authorization to purchase tract 20

11/10/2020

1.a

Authorization to purchase tract 33

12/01/2020

1.a.3

Authorization to purchase tract 26

12/01/2020

1.a.4

Authorization to purchase tract 35

12/01/2020

1.a.5

Authorization to purchase tract 36

12/01/2020

1.a.6

Authorization to purchase tract 38

12/01/2020

1.a.7

Authorization to purchase tract 39

01/05/2021

1.d.8

Authorization to acquire 4 tracts

01/26/2021

1.c

Authorization to acquire 2 tracts

02/26/2021

21-539

Execute an addendum with I.S. Engineers, LLC

03/09/2021

21-723

Authorization to purchase tract 15

05/11/2021

21-1963

Authorization to purchase tract 21B

05/11/2021

21-2049

Execute an agreement with I.S. Engineers, LLC

05/25/2021

21-2252

Authorization to purchase tract 21A

08/24/2021

21-4283

Execute an agreement with Chesmar Homes, LLC

10/12/2021

21-5319

Authorization to purchase tract 1A

01/25/2022

22-0328

Execute SOLS

01/25/2022

22-0335

Authorization to acquire 1 tract

02/22/2022

22-1180

Execute a reimbursement agreement with HMH Lifestyles, LP

03/22/2022

22-1902

Execute an agreement with BNSF Railway Company

05/10/2022

22-2919

Authorization to purchase tract 40

10/18/2022

22-6184

Execute a joint participation agreement with Tandem Energy Corporation

11/15/2022

22-7311

Execute a joint participation agreement with ExxonMobil Pipeline Company, LLC

11/15/2022

22-7200

Negotiate with Atser, LP for Professional Engineering Services

01/10/2023

23-0132

Execute an agreement with Atser, LP

01/31/2023

23-0659

Execute an agreement with Halff Associates, Inc.

02/21/2023

23-1372

Execute an agreement with Pelican Reserve Pipeline Company, Tomball Production Company, and Tortuga Operating Company

01/10/2023

23-0366

Contract Award

06/27/2023

23-3660

Contract Amendment #1 for additional funds and extensions of project term

08/08/2023

23-4445

Contract Amendment #3 for additional funds and extensions of project term

08/08/2023

23-4529

Contract Amendment #5 for additional funds

08/08/2023

23-4446

Contract Amendment #4 for additional funds

08/29/2023

23-4965

Contract Amendment #2 for additional funds

08/29/2023

23-4974

Contract Amendment #6 for additional funds

08/29/2023

23-4966

Contract Amendment #7 for additional funds

10/10/2023

23-6005

Contract Amendment #8 for additional funds

12/05/2023

23-6959

Contract Amendment #9 for additional time

03/26/2024

24-1549

Contract Amendment #10 for additional funds and extension of project term

03/26/2024

24-1550

Contract Amendment #11for additional funds

05/07/2024

24-2616

Contract Amendment #12 for additional funds

08/06/2024

24-4692

Contract Amendment #13

08/06/2024

24-4697

Contract Amendment #14

10/08/2024

24-6291

Execute an amendment with Pelican Reserve Pipeline Company, Tomball Production Company, and Tortuga Operating Company

 

Location:

Address (if applicable): Holderrieth Road

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 2601, 2699

$

$58,664.19

$58,664.19

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$58,664.19

$58,664.19

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$58,664.19

$58,664.19

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/9/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, Chief of Engineering and Architectural Services, Harris County Engineering Department

 

Attachments (if applicable): County Auditor’s Form 1258B.