Legislation Details

File #: 26-7455    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/29/2026 In control: Commissioners Court
On agenda: 11/12/2026 Final action: 11/12/2026
Title: Request for approval of an amendment to an agreement with iGET Services LLC, in the amount of $159,575, for engineering services to provide design, bidding, and construction phase engineering services in support of the Red Bluff Regional Stormwater Detention Basin (Armand Bayou Watershed, Bond ID C-07, Project ID B509-04-00-E002, Agreement No. 2023-26, Precinct 2, CDBG-DR, MWBE Contracted Goal: 20.54%, MWBE Current Participation: 100%).
Attachments: 1. 111226 AMEND IGET 2023-26 PCT 2 backup.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): B509-04-00-E002

Vendor/Entity Legal Name (if applicable): iGET Services LLC

 

MWBE Contracted Goal (if applicable): 20.54%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with iGET Services LLC, in the amount of $159,575, for engineering services to provide design, bidding, and construction phase engineering services in support of the Red Bluff Regional Stormwater Detention Basin (Armand Bayou Watershed, Bond ID C-07, Project ID B509-04-00-E002, Agreement No. 2023-26, Precinct 2, CDBG-DR, MWBE Contracted Goal: 20.54%, MWBE Current Participation: 100%).

end

 

Background and Discussion:

The proposed Genoa Red Bluff Stormwater Detention (SWD) basins are located within the Armand Bayou (B100-00-00) watershed along Spring Gully (B109-00-00). The site is partially located within the City of Pasadena. The proposed SWD basins are intended to mitigate the future channel improvements from La Porte’s Brookglen Regional Plan, which is a flood risk reduction plan to relieve the repetitive flooding in the Brookglen neighborhood located in La Porte to the north. Phase 1 construction has been completed under B509-03-00-E001. Phase 2 design and construction includes expansion of the detention basin to its full capacity. Project is being funded by the 2018 Bond and CDBG-DR program.

 

Expected Impact:

This project seeks to reduce flood risks and strengthen resiliency in the Armand Bayou Watershed by alleviating property and structural damages to the adjacent communities. The project potentially provides up to 1,097.1 ac-ft of detention along B109-00-00 with reduced flooding for 706 structures, 6.4 miles of roadway and 215 sq-ft of floodplain area under a 100-yr storm event. It will also reduce the financial impact of recovery costs to Harris County and federal flood insurance program.

 

Alternative Options:

A no action alternative would fail to meet the purpose and needs of mitigating flood risk and provide additional system capacity for this Community Development Block Grant Disaster Recovery (CDBG-DR) funded project. Under the no action alternative, area residents would continue to be affected by area flooding.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

7/14/2020

2.b.

ATN

6/8/2021

90.

Agreement 2021-54

3/14/2023

348.

Transmittal of Preliminary Engineering Report

5/07/2024

106.

Agreement 2023-26

 

Location: Spring Gully (B109-00-00)

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$159,575

$159,575

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$159,575

$159,575

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$159,575

$159,575

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/12/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement