File #: 21-4812    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 9/7/2021 In control: Commissioners Court
On agenda: 9/14/2021 Final action: 9/14/2021
Title: Request for approval of a contract award to McDonough Engineering Corporation, in the amount of $249,645, to provide design, bidding, and construction phase engineering services for the construction of the Baywood Stormwater Detention Basin at HCFCD Unit B513-02-00, Armand Bayou Watershed, Bond ID F-72, Project ID B513-02-00-E003, Agreement No. 2022-57, Precinct 2.
Attachments: 1. 21-4812 AGMT MCDONOUGH 2022-57 PCT 2 backup

Department: Flood Control District

 

Department Head/Elected Official: Alan R. Black, P.E., Interim Executive Director

 

Regular or Supplemental RCA:

Regular RCA

Supplemental RCA

 

Type of Request: Contract - Award

 

Project ID (if applicable): B513-02-00-E003

Vendor/Entity Legal Name (if applicable): McDonough Engineering Corporation

MWDBE Participation (if applicable):

Prime is not MWBE

 

 

 

 

 

 

Consultant

Role

MWBE

Amount

McDonough Engineering

Prime

N

 $      197,772.50

Ninyo & Moore

Sub

Y

 $        21,562.00

MBCO

Sub

N

 $        30,310.00

Total Agreement

 

 

 $      249,644.50

MWBE $

 

 

 $        21,562.00

MWBE %

 

 

9%


Request Summary (Agenda Caption):

title

Request for approval of a contract award to McDonough Engineering Corporation, in the amount of $249,645, to provide design, bidding, and construction phase engineering services for the construction of the Baywood Stormwater Detention Basin at HCFCD Unit B513-02-00, Armand Bayou Watershed, Bond ID F-72, Project ID B513-02-00-E003, Agreement No. 2022-57, Precinct 2.

end

 

Background and Discussion:

This project scope consists of a 138-acre detention basin to provide flood damage reduction. The site was previously being used for excavation and removal.

 

Expected Impact:

The project will improve flooding conditions within the vicinity of the detention basin by almost 1 foot in some areas.

 

 

 

 

 

Alternative Options:

The alternative to this agreement being approved is that we will need to seek another consultant for the work to be performed, which will significantly delay this bond project.

 

 

 

 

Alignment with Goal(s):

Justice and Safety

Economic Opportunity

Housing

Public Health

 

 

Transportation

Flooding

Environment

Governance and Customer ServicePrior Court Action (if any):

08/28/2018, [2.b.9], ATN

11/13/2018, [2.a.10], Agreement

Location:

Address (if applicable list below):

Baywood Stormwater Detention Basin

 

Countywide

Precinct 1

Precinct 2

 

Precinct 3

Precinct 4Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

FY 21-22

Estimates

 

 

 

FY 22

Next 3 FYs

Incremental Expenditures

Labor Expenditures

-

-

-

Non-Labor Expenditures

167.4K

74.5K

8K

Total Incremental Expenditures

167.4K

74.5K

8K

Funding Sources (General Fund, PIC Fund, Debt or CP, Grants, or Other - Please Specify)

Existing Budget

Bond ID F-72

167.4K

74.5K

8K

 

-

-

-

-

 

-

-

-

-

Total Current Budget

-

-

-

Additional Budget Requested

-

-

-

-

 

-

-

-

-

 

-

-

-

-

Total Additional Budget Requested

-

-

-

Total Funding Sources

167.4K

74.5K

8K

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Implementation Date: September 14, 2021

 

Emergency/Disaster Recovery Note:

Not an emergency, disaster recovery, or COVID-19 related item

 

Emergency Item

COVID-19 related Item

Disaster Recovery related Item

 

Contact(s) name, title, department:                     Alan R. Black, P.E., Interim Executive Director

                                                                                                                              Matthew K. Zeve, P.E., Deputy Executive Director

 

Attachments (if applicable): Agreement