File #: 26-0193    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 12/22/2025 In control: Commissioners Court
On agenda: 1/8/2026 Final action: 1/8/2026
Title: Request for approval of a change in contract with Texas Materials Group, Inc., in connection with final construction of Asphalt Package 2024-1, adding 11 calendar days, with a deduction in the amount of $480,928.97, Job No. 24/0374-1, UPIN 24208MF36G01, Precinct 3, MWBE Contracted Goal: 31.30%, MWBE Current Participation: 30.46%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0374, UPIN 24208MF36G01

Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.

 

MWBE Contracted Goal (if applicable): 31.30%

MWBE Current Participation (if applicable): 30.46%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Texas Materials Group, Inc., in connection with final construction of Asphalt Package 2024-1, adding 11 calendar days, with a deduction in the amount of $480,928.97, Job No. 24/0374-1, UPIN 24208MF36G01, Precinct 3, MWBE Contracted Goal: 31.30%, MWBE Current Participation: 30.46%.

end

 

Background and Discussion:

The scope of work consists of, however, not limited for the rehabilitation of the Asphalt roadways to include 2.5 miles of Main Street (Crosby Lynchburg Road), within Harris County Precinct 3 Area.

 

Expected Impact

The Office of County Engineer (OCE) seeks approval of the following Proposed Change Orders (PCOs) with their corresponding approved RFIs:

•                     PCO #1 (RFI #8): Temporary work zone striping was required following milling operations to ensure the safety of the traveling public during construction.  As this work was not included in the original contract, the Contractor submitted a proposal that was reviewed, approved, and concurred by the precinct.  OCE seeks to compensate the Contractor accordingly.

•                     PCO #2 (RFI #13): Installation of 8” white solid striping, as required per plan sheets #25 and #26, did not have a corresponding pay item in the contract.  The Contractor submitted a proposal for this work, which was reviewed, approved, and concurred by the precinct.  OCE seeks to compensate the Contractor for this required work performed in accordance with the project plans.

•                     PCO #3 (RFI #11): The Contractor is granted 11 additional contract days due to the following impacts:

o                     Seven days were granted after the 4th of July, Memorial Day and Juneteenth weekends, when night work was suspended for safety concerns.  Milling operations at night were being performed on a heavily traveled roadway where impaired drivers had previously entered the work zone and struck equipment.

o                     Two days added at the Main Street (Crosby-Lynchburg) driveway, where field conditions required increasing the asphalt overlay depth from 2 inches to 3 inches.

o                     Two Days for additional base repair requested at station 8+00 SB on IH-10 and Bridge required and performed after all other base repairs requested was completed and crew demobilized.

 

An eight-day contract extension to address the Contractor’s documented impacts while assessing seven days of liquidated damages in accordance with the contract terms.  This adjustment is made for the purpose of cooperating with the contractor for the requested documented delays, thus reconciling the project, allowing issuance of final payment and proceeding to close out.

 

Alternative Options:

No alternative options at this time.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/09/2025

370 (25-0403)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 2601, 2699

$

-$480,928.97

-$480,928.97

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$480,928.97

-$480,928.97

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$480,928.97

-$480,928.97

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/8/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B