File #: 26-6707    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 10/1/2026 In control: Commissioners Court
On agenda: 10/15/2026 Final action:
Title: Request for approval of an amendment to an agreement with HR Green Inc., in the amount of $226,757, to provide design, bidding, and construction phase engineering services in support of a detention basin along HCFCD Unit C144-00-00 (Sims Bayou Watershed, Bond ID F-95, Project ID C144-00-00-E001, Agreement No. 2023-28, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 36%).
Attachments: 1. 101526 AMEND HR GREEN 2023-28 PCT 1 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): C144-00-00-E001

Vendor/Entity Legal Name (if applicable): HR Green, Inc.

 

MWBE Contracted Goal (if applicable): 20%

MWBE Current Participation (if applicable): 36%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with HR Green Inc., in the amount of $226,757, to provide design, bidding, and construction phase engineering services in support of a detention basin along HCFCD Unit C144-00-00 (Sims Bayou Watershed, Bond ID F-95, Project ID C144-00-00-E001, Agreement No. 2023-28, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 36%).

end

 

Background and Discussion:

This first amendment will provide  additional design, bidding and construction phase engineering services for Drainage improvements at Anderson Road and C144-00-00. This project occurs in the 2nd quartile under the 2022 Prioritization Framework approved by Commissioners Court. This amendment provides additional design, bidding and construction phase engineering services for the expanded scope and proposed construction phasing of the Drainage improvements at Anderson Road and C144-00-00.

 

Expected Impact:

The project seeks to reduce flood risks and strengthen resiliency in the Sims Bayou watershed by reducing inundation depth for 13 structures, and flood risk for 1 structure, 3.7 acres, and 0.08 miles of roadway for the 100-yr storm event.

 

Alternative Options:

The alternative to approval of this item would be to select a different consultant to complete the design, which would result in a delay in the project and realization of the benefits.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/10/2023

118.

Agreement

04/04/2023

315.

Transmittal of PER

07/20/2021

135.

Agreement

02/26/2021

81.

ATN

 

Location: Anderson Road and C144-00-00

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$226,757

$226,757

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$226,757

$226,757

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$226,757

$226,757

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 10/15/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 