Project Name: Cypress Camp Expansion
Project ID (if applicable): FY27_CYP_CAMP
Vendor Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): N/A
MWBE Current Achievement (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Incremental Authorization Requested: $1,960,000
Total Estimated Project Cost: $1,960,000
Request Summary:
title
Request for approval of a Final Investment Memo for the Cypress Camp Expansion project in the amount of $1,960,000, and request for approval of commercial paper funding in the amount of $1,960,000.
end
Project Description:
The project includes construction of a 40’ x 125’ covered equipment shed, a 45’ x 25’ expansion of the existing shed for an equipment wash bay, a single 20’x30’ metal storage building, and a new 40’x60’ metal park office to replace the existing rental trailer. Work includes concrete foundations, metal building structures, and associated site improvements. Interior buildouts will be completed by Precinct 3 staff. Project also includes installation of site drainage underground and supporting inlets. Entire site will be regraded, stabilized and paved to improve equipment access. Trash compactor and supporting site improvements will be added. Concrete pad will be placed by contract. An emergency and delivery driveway will be installed with associated fence modifications to receive an electric gate. Two existing manual gates will be replaced with electric rolling gates. Existing fuel USTs will be removed and remediated with a new fuel station being constructed with above ground skid tanks and associated containment per current standards. Striping of site parking will be done in house.
Anticipated Project Expenditures and Timeline:
|
Project Scope Breakdown |
Estimated Cost |
Estimated Completion |
|
Construction (Contractor) |
$500,000 |
February 2027 |
|
Facility Improvements (In-House) |
$891,800 |
May 2027 |
|
Trash Compactor Installation (Contractor) |
$315,000 |
May 2027 |
|
Electric Gate Installation (Contractor) |
$75,000 |
May 2027 |
|
Contingency |
$178,200 |
|
|
Total |
$1,960,000 |
- |
Justification & Alternatives:
The expansion will improve maintenance operations by protecting County equipment from weather damage, providing dedicated cleaning and secure storage facilities, and replacing leased office space with a County-owned facility. These improvements will extend equipment life, improve operational efficiency, and eliminate ongoing office rental expenses. The project will support more reliable maintenance of public assets facilities while reducing long-term operating costs.
Anticipated Impact on Other Funds (If Applicable):
|
Fund Code |
Description |
Estimated Cost |
Funding Method (Existing or Future Budget Request Required) |
Estimated Date of Needs |
|
|
|
$- |
|
- |
|
|
|
$- |
|
- |
|
Total |
|
$- |
|
- |
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: Choose an item.
Justice/Safety Initiative (Goal 1): Choose an item.
Infrastructure Initiative (Goal 2): H4: Consistently embed sustainability considerations in the project planning and design process.
Economy Initiative (Goal 3): Choose an item.
Health Initiative (Goal 4): Choose an item.
Climate/Resilience Initiative (Goal 5): Choose an item.
Housing Initiative (Goal 6): Choose an item.
Previous Court Action:
|
Date |
Agenda Item # |
Action Taken |
|
2/6/2026 |
209 |
Request for discussion and possible action to increase the biennial allocation of non-voted commercial paper to the commissioner precincts from $15M to $20M, effective with the current FY26 period. |
Address: 15530 Huffmeister Road, Cypress, TX 77429
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
FY27_CYP_CAMP |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
|
|
|
|
|
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request |
|
|
Commercial Paper |
$ |
$1,960,000 |
$1,960,000 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Commercial Paper |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$1,960,000 |
$1,960,000 |
$ |
|
Total Funding Request |
$ |
$1,960,000 |
$1,960,000 |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 12/3/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Legal funding compliance confirmed by: Sandra Andersson Staine, Senior Assistant County Attorney, 11/16/2026
Department Approval by: Jared Bruce, Assistant Director of Budget and Finance & Jennifer Almonte, Director of Road and Bridge & David Tamborella, Director of Parks & David Pulpan, Director of Building Maintenance
OMB CIP Team Approval by: William McGuinness, Director-Capital Projects & Infrastructure, 11/16/2026
Commercial Paper Request (For OMB use only):
Receiving Department: Commissioner, Precinct 3
Project PeopleSoft ID: FY27_CYP_CAMP
CP Series Description: Commercial Paper Series D-3 can be used for (1) construction of public works, (2) the purchase of automobiles, equipment and machinery, including computers, materials and supplies for the operation of the County’s precincts and departments (3) Professional services, including services provided by engineers, architects, attorneys, auditors, financial advisors, and fiscal agents, in connection with the contractual obligations described in (1) and (2).
Commercial Paper is being requested for Cypress Camp Expansion project and is expected to be repaid within the next three fiscal years either through bonds, budgetary means or pay-as-you-go sources.
OMB Financial Management contact: Fahad Gulzar, Deputy Executive Director, Office of Management and Budget