File #: 25-2691    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval to execute an interlocal agreement with The City of Houston for property dedication, construction, and maintenance in connection with Lockwood Overpass Parking Lot & Improvements, Crites St to Buffalo Bayou underneath Lockwood along proposed Foley St., UPIN 21102MF1SM01, Precinct 2.
Sponsors: Mony Hossain
Attachments: 1. 25-2691-Partnership-- HC-COH RCA-Lockwood Updated PDF.docx.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): UPIN 21102MF1SM01

Vendor/Entity Legal Name (if applicable): City of Houston

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  Exempt - Interlocal/Cooperative Agreement

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an interlocal agreement with The City of Houston for property dedication, construction, and maintenance in connection with Lockwood Overpass Parking Lot & Improvements, Crites St to Buffalo Bayou underneath Lockwood along proposed Foley St., UPIN 21102MF1SM01, Precinct 2.

end

 

Background and Discussion:

 

In 2022, Harris County to entered into a Tri-Party agreement with the City of Houston and the Buffalo Bayou Partnership for the development, construction, and maintenance of the Buffalo Bayou East Project.

The Lockwood Drive project, a collaboration between the Harris County, City of Houston, and Buffalo Bayou Partnership, aims to enhance vehicular and pedestrian mobility while supporting the ongoing residential and recreational developments along Buffalo Bayou. This regional master plan will increase safety and accessibility through the construction of new roads, sidewalks, traffic signals, parking facilities, and trail connections, benefiting the community and boosting future growth. Harris County will provide funding for Project Costs, including payment for the Work and payment to BBP as consideration for the SPUR TRACT, up to the $4,088,075.00.

 

 

 


Expected Impact:

 

The project is expected to improve traffic flow and reduce congestion by adding new road connections and a signalized intersection. It will enhance pedestrian safety and mobility with the addition of sidewalks, trails, and lighting. The new parking area under the Lockwood Bridge will provide convenient parking and better utilize existing space. Furthermore, the installation of a stormwater system will improve drainage and mitigate flood risks. Overall, the project will create a safer, more accessible, and better-connected environment for residents and visitors.

 

Alternative Options:

 

Do not proceed with the proposed modifications to Lockwood Drive at Buffalo Bayou unless Harris County fully funds the construction costs.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

9/27/2022

22-6031

Request by the County Attorney for discussion and approval for Harris County to enter into a Tri-Party agreement with the City of Houston and the Buffalo Bayou Partnership for the development, construction, and maintenance of the Buffalo Bayou East Project.

1/9/2025

25-0171

Transmittal by the Office of the Purchasing Agent of a project scheduled for advertisement for infrastructure improvements on Lockwood Drive between Crites Street and Buffalo Bayou for Precinct 2 (240407)

3/27/2025

25-1889

Request for approval to execute an interlocal agreement with The Buffalo Bayou Partnership for property dedication, construction, and maintenance in connection with Lockwood Overpass Parking Lot & Improvements, Crites St to Buffalo Bayou underneath Lockwood along proposed Foley St., UPIN 21102MF1SM01, Precinct 2.

4/10/2025

25-2208

Request for approval of an award on the basis of lowest complete bid to Environmental Allies, LLC in the amount of $4,477,984 for infrastructure improvements on Lockwood Drive between Crites Street and Buffalo Bayou for Precinct 2 and for the County Clerk to execute any applicable bonds to be received (240407), MWBE Contracted Goal: 25.21%.

 

Location:

Address (if applicable):  601 Lockwood Dr, Houston, TX 77011

Precinct(s): Precinct 2

 

 

 

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$4,088,075.50

$4,088,075.50

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$4,088,075.50

$4,088,075.50

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$4,088,075.50

$4,088,075.50

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): 5/8/2025

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Cassandra Green, PE, Director of Technical Services, OCE

 

Attachments (if applicable): Interlocal Agreement