File #: 26-0210    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 12/22/2025 In control: Commissioners Court
On agenda: 1/8/2026 Final action: 1/8/2026
Title: Request for approval to execute an agreement with Torres & Associates, LLC, in the amount of $149,770.00 for Construction Phase Services in connection with Forest Manor and Lake Houston Woodland Terrace Subdivisions Drainage Improvements - 2019, UPIN 20090MF1HA01, Precinct 3, MWBE Contracted Goal: 19.74%.
Attachments: 1. 26-0210-Consultant-UPIN 20090MF1HA01-Forest Manor-Torres & Associates-P3-01082026

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 20090MF1HA01

Vendor/Entity Legal Name (if applicable): Torres and Associates, LLC.

 

MWBE Contracted Goal (if applicable): 19.74%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Torres & Associates, LLC, in the amount of $149,770.00 for Construction Phase Services in connection with Forest Manor and Lake Houston Woodland Terrace Subdivisions Drainage Improvements - 2019, UPIN 20090MF1HA01, Precinct 3, MWBE Contracted Goal: 19.74%.

end

 

Background and Discussion:

The project is located in the northeast Harris County in the Cedar Bayou watershed, east of FM 2100 and south of FM 1960. The Forest Manor subdivision consists of roadside ditches and drains into HCFCD channel Q134-00-00. The proposed improvements in the subdivision are to regrade roadside ditches, install storm sewer beneath ditches, construct driveways and driveway culverts. The additional funds will cover the construction phase services agreement to allow for construction oversight of the subdivision drainage improvements.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Forest Manor community.  The fiscal impact for this project will come from the 1080 Funding for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future. No impact on project schedule or cost anticipated.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it.  However, if not approved, the project may not be constructed. As a result, the community may continue to experience flood risk.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):  N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Forest Manor Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Construction Phase Professional Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$149,770.00

$149,770.00

$

Other

$

$

$

$

Total Existing Budget

$

$149,770.00

$149,770.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$149,770.00

$149,770.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/8/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contract Agreement and Exhibits