Primary Department: County Engineer
Primary Department Head/Elected Official: Dr. Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Lesley Briones, Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN 24104MF3B601
Vendor/Entity Legal Name (if applicable): MBCO Engineering LLC
MWBE Contracted Goal (if applicable): 20.09%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by MBCO Engineering LLC, for Sidewalk - Various Locations HCMUD 102 - 2024, UPIN 24104MF3B601, Precinct 4.
end
Background and Discussion:
The County entered into an agreement with MBCO Engineering LLC on March 27, 2025, to provide professional services for the Sidewalk - Various Locations HCMUD 102 - 2024. Approval of the study report will conclude the Study Phase and initiate the Design Phase.
Expected Impact:
The study is anticipated to support proposed mobility and drainage improvements along major roadways within HC MUD 102 and Precinct 4. The project will enhance safety, mobility, and capacity specific to each location to provide safer travel for pedestrians.
Alternative Options:
If the County could not elect to approve this request, the consultant will be unable to complete the scope of work or proceed with the design phase. As a result, the safety and mobility benefits associated with the proposed improvements would not be achieved, thereby depriving residents and pedestrians of these enhancements.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): G1: Expand pedestrian and cyclist infrastructure on County-managed roads,
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
08/06/2024 |
86 (24-4540) |
Authorization to Negotiate |
|
04/10/2025 |
62 (25-2124) |
Professional Service Agreement |
Location:
Address (if applicable): Various Locations within HC MUD 102 - W Little York Rd, Addicks Satsuma Rd, Huffmeister Rd, and Hamstead Park Dr
Precinct(s): Precinct 4
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering Services |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Bonds - 3109 Road Bond |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 9/17/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering & Architectural Services, Office of the County Engineer
Attachments (if applicable): Study Report