File #: 25-5620    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/2/2025 In control: Commissioners Court
On agenda: 9/18/2025 Final action: 9/18/2025
Title: Request for approval of a change in contract with Hayden Paving, Inc., in connection with Asphalt Package 2024-2, with an addition in the amount of $246,500.00, Job No. 24/0226-1, UPIN 24208MF36H01, Precinct 3, MWBE Contracted Goal: 32.56%, MWBE Current Participation: 31.37%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0226, UPIN 24208MF36H01

Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.

 

MWBE Contracted Goal (if applicable): 32.56%

MWBE Current Participation (if applicable): 31.37%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Hayden Paving, Inc., in connection with Asphalt Package 2024-2, with an addition in the amount of $246,500.00, Job No. 24/0226-1, UPIN 24208MF36H01, Precinct 3, MWBE Contracted Goal: 32.56%, MWBE Current Participation: 31.37%.

end

 

Background and Discussion:

The scope of work consists of, but not limited to, the following tasks for reconstruction of approximately 3.18 miles of roads - Van Road 0.85 mile, Ramsey Road (2.3 miles), a portion of shields street within Missouri Pacific Railroad Right-of-Way (160 LF), and the rehabilitation of Plum Grove Road 2.25 within Harris County Precinct 3 area.

 

This change in contract includes:

  • PCO #01 (RFI #9): Addition of a new line item for Cement Stabilization to be used for subgrade stabilization in areas where it is deemed the most appropriate method as opposed to Lime and Fly Ash.

 

Expected Impact:

Improved overall subgrade stabilization and enhanced long-term durability of the roadway, along with a reduction in the overall contract cost.  The net cost impact to the contract is estimated to be a savings of $22,917.00.

 

 

Alternative Options:

While lime and fly ash could be used as an alternative, this method is less effective in terms of long-term durability and would result in higher overall costs.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/12/2024

247 (24-7181)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other                     3109

$

$246,500.00

$246,500.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$246,500.00

$246,500.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$246,500.00

$246,500.00

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B