Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a joint use agreement with Texas Department of Transportation (TxDOT) to establish joint access within TxDOT right-of-way, allowing the Flood Control District to perform construction and permanent maintenance (Addicks Reservoir Watershed, Project ID U501-07-00-E002, CDBG-MIT, Agreement No. 2026-105, Precinct 4).
end
Background and Discussion:
This agreement will allow access for both construction and permanent maintenance operations of Basin West 3. The Stormwater Detention Basins on South Mayde Creek Near the Grand Parkway - Phase 1 (Project) has recently commenced construction. The Project is located west of Grand Parkway, North of Clay Road, south of Stockdick School Road, east of Peek Road, and within Harris County Precinct 4. The objective of the Project is to maximize stormwater storage capacity and reduce flood risk along South Mayde Creek (Unit ID: U101-00-00).
The Project will include construction of two wet-bottom compartments (West 2 and West 3) with gravity-only outfalls and overflow spillways into South Mayde Creek. Access to West 3 will come via Clay Road, with permanent access through TxDOT right-of-way, a CenterPoint easement, and a low-water crossing at the U201-09-00 channel. An Agreement has been prepared by the County Attorney’s Office and reviewed with TxDOT’s legal team. Based on correspondence received from the County Attorney’s Office and TxDOT, the Agreement is ready to proceed forward to approval and signatures.
This project includes U501-07-00-E002: Stormwater Detention Basins on South Mayde Creek Near the Grand Parkway - Phase 1.
Expected Impact:
Basin West 3 provides an additional 123 acre-feet of detention storage to South Mayde Creek. The Agreement is needed to establish construction and long-term maintenance access to the Basin West 3 site.
Alternative Options:
The alternative to approving this item would be not approve the Agreement, which would result in the project not moving forward.
County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H1: Complete and implement the Flood Resilience Plan.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any): N/A
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location: N/A
Address (if applicable):
Precinct(s): Precinct 4
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 10/29/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Agreement