Skip to main content
Harris County Logo
File #: 25-2734    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 3778 1/2 Fry Road, Katy Texas 77449 (Intersection of Fry Road and Westfield Pkwy Drive) for electrical power serving a traffic signal associated with Traffic Signal and Intersection Improvement Package - Fry Road Project, UPIN 23104MF2XH01, Precinct 4.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, Env. SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): 23104MF2XH01

Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 3778 ½ Fry Road, Katy Texas 77449 (Intersection of Fry Road and Westfield Pkwy Drive) for electrical power serving a traffic signal associated with Traffic Signal and Intersection Improvement Package - Fry Road Project, UPIN 23104MF2XH01, Precinct 4.

end

 

Background and Discussion:

Traffic signal warrants were performed for a traffic impact study as part of traffic improvement project on Fry Road, the analysis warranted a traffic signal at the intersection of Fry Road and Westfield Pkwy Drive.  Currently the intersection is unsignalized and has stop sign control for minor street. The signal will be constructed under Traffic Signal and Intersection Improvement Package - Fry Road - 2023 - UPIN 23104MF2XH01, Precinct 4. Project. 

 

Expected Impact:

The project will install a new traffic signal at the intersection with exclusive left turn lanes and extend the capacity of the existing left turn lanes along Fry Road, to safely handle the demands of the current and future traffic volumes. The improvements will alleviate congestion, reduce delays, and provide safe mobility for residents, pedestrians, and drivers through the intersection.

 

Alternative Options:

All traffic signals require a reliable and uninterrupted power source for continuous operations, which is typically obtained through CenterPoint Energy Houston Electric, LLC. Alternative options are to provide a gas operated generator, which is not reliable nor feasible, or not to install traffic signal at the intersection. Both options will negatively impact operations  and deteriorate safety and efficiency. If not approved, the residents and road users will not benefit from the safety and mobility improvements at this location .

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: Increase safety and efficiency of intersection operation through the installation of signal and exclusive storage lanes for turning traffic.  

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/05/2023

         49

Request for approval to execute an agreement with Agha Engineering LLC in the amount of $398,313.00 for Professional Engineering Services for the Proposed Traffic Signal and Intersection Improvements Fry Road Package - 2023, UPIN 23104MF2XH01, Precinct 4, MWDBE Contracted Goal: 20%, Current Participation: 100%.

01/23/2025

         54

Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, seven (7) road easement tracts for the public project known as Traffic Signal and Intersection Improvement Package - Fry Road - 2023, for the purpose of roadway construction, UPIN 23104MF2XH01, Precinct 4.

 

Location:

Address (if applicable): 3778 ½ Fry Road, Katy Texas 77449

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$

$

$1,200

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$1200

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$1,200

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/22/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., Senior Director, Capital Project Infrastructure, Harris County Engineering Department.

 

Attachments (if applicable): Service Outlet Location and Data Statement for Electric Service Agreement.