Legislation Details

File #: 26-7850    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 11/13/2026 In control: Commissioners Court
On agenda: 12/3/2026 Final action:
Title: Request for approval of an agreement with East Lake Houston Management District to establish regional drainage solution excavation in the Little Cypress Creek Watershed on Flood Control District Unit L512-01-00 (Little Cypress Creek Watershed, Project ID L100-00-00-Y007, Agreement No. 2025-85, Precinct 4).
Attachments: 1. 120326 AGMT EAST LAKE MGMT DISTRICT 2025-85 PCT 4 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): L100-00-00-Y007

Vendor/Entity Legal Name (if applicable): East Lake Houston Management District

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with East Lake Houston Management District to establish regional drainage solution excavation in the Little Cypress Creek Watershed on Flood Control District Unit L512-01-00 (Little Cypress Creek Watershed, Project ID L100-00-00-Y007, Agreement No. 2025-85, Precinct 4).

end

 

Background and Discussion:

This interlocal agreement will allow permit coverage for developer property in exchange for regional drainage solution excavation in the Little Cypress Creek Watershed on HCFCD Unit L512-01-00. This project includes This agreement represents the East Lake Houston Municipal Management District (ELHMD) voluntary joining of the Little Cypress Creek Regional Stormwater Quality Program, established to meet the needs of the Little Cypress Creek Regional Frontier Program. The stormwater quality program represents three of the goals listed in the interim guidelines for new development in Little Cypress Creek; provide for regional stormwater quality features, facilitate multi-use objectives, and facilitate long term maintenance objectives. ELHMD during development sought to complete improvements identified in the Little Cypress Creek interim guidelines, detention excavation equal to the Flood Control District’s environmental enhancement costs and offset water quality required by the development area to meet Harris County Stormwater Quality Regulations. The agreement would signify the acceptance of the identified drainage area for coverage under the Flood Control District’s Regional Little Cypress Creek Stormwater Quality Permit for in-kind excavation work.

 

Expected Impact:

This agreement will increase effective detention volume at (L512-01-00) Kleb Woods Stormwater Detention Basin and offset the Flood Control District’s burden of wetland plantings cost through in-kind water quality excavation. ELHMD will claim limited water quality volume from the Stormwater Quality Program ledger and allocate to the L512-01-00 basin. Increases of impervious surface beyond the development threshold will require developers to provide additional water quality improvements.

 

Alternative Options:

N/A

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement