Legislation Details

File #: 26-5936    Version: 1 Name:
Type: Utility Agreement Status: Agenda Ready
File created: 9/2/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Request for approval of the Right-of-Way Consent Agreement with ExxonMobil Pipeline Company LLC (EMPCo) to allow two proposed drainage channel encroachments within EMPCo's pipeline easement with conditionally approved improvements, subject to Harris County's acceptance of the agreement's terms, conditions, and right-of-way restrictions.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): Job No. 25/0194, UPIN 19101MF14G01

Vendor/Entity Legal Name (if applicable): Exxonmobil Pipeline Company LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of the Right-of-Way Consent Agreement with ExxonMobil Pipeline Company LLC (EMPCo) to allow two proposed drainage channel encroachments within EMPCo's pipeline easement with conditionally approved improvements, subject to Harris County's acceptance of the agreement's terms, conditions, and right-of-way restrictions.

end

 

Background and Discussion:

ExxonMobil Pipeline company LLC (EMPCo) reviewed Harris County's proposed drainage improvements, which include concrete channel lining and channel expansion at two locations within its pipeline easement. To protect its petroleum pipeline facilities and comply with state and federal safety requirements, EMPCo requires Harris County to comply with specific construction, notification, liability, maintenance, and indemnification provisions before work may proceed.

Expected Impact:

Approval of the agreement will allow the proposed drainage improvements to proceed while protecting EMPCo's pipeline infrastructure. The agreement establishes safety requirements and construction responsibilities to ensure regulatory compliance and minimize risks.

Alternative Options:

Approve the agreement to proceed with construction, revise the design to avoid the easement, or decline the agreement and postpone the improvements.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

 

 

 

Location: Houmont Park Subdivision

Address (if applicable): Lat/Long: 29.836

, -95.210 - first encroachment and 29.835122°, -95.208061°-second encroachment

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other

$

0

0

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$0.0

$0.0

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$0.0

$0.0

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/17/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): N/A