Legislation Details

File #: 24-7503    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 11/24/2024 In control: Commissioners Court
On agenda: 12/10/2024 Final action: 12/10/2024
Title: Transmittal by the Office of the County Engineer of a substantial completion certificate with Total Contracting Limited, in connection with the construction of Sidewalk and Park Project Addicks Clodine - Westpark Sidewalk, Job No. 23/0235, UPIN 20103N302902, Precinct 4.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): Job No. 23/0235, UPIN 20103N302902

Vendor/Entity Legal Name (if applicable): Total Contracting Limited

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Transmittal by the Office of the County Engineer of a substantial completion certificate with Total Contracting Limited, in connection with the construction of Sidewalk and Park Project Addicks Clodine - Westpark Sidewalk, Job No. 23/0235, UPIN 20103N302902, Precinct 4.

end

 

Background and Discussion:

The project includes the construction of concrete sidewalk with ADA ramps on Addicks Clodine Road from Westpark Drive to 300 LF South of Westheimer Road, and Westpark Drive from Summit Valley Drive to 300 LF west of South Highway 6. This project was completed to ensure reliable and safe route of transportation to residents of the Harris County.  The project was overseen by Harris County Engineering Department CPI-Horizontal team.

 

The Substantial Completion Certificate provides documentation that a capital improvement project meets the qualifications of Substantial Completion in accordance with the Contract Documents as determined by the County Engineer.  Substantial Completion establishes the date on which a capital improvement enters service as a Harris County asset.  The establishment and reporting of this date are important for all governmental entities as outlined in the GASB Statement #34, Capital Assets & Depreciation Guidance, August 31, 2001.  These certificates provide a method by which Harris County may document and record this date.

 

Expected Impact:

This action establishes the date on which a capital improvement enters service as a Harris County asset.

Alternative Options:

No alternative option.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/10/2023

23-5993

Contract Award

 

Location:

Address (if applicable): N/A

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: December 10, 2024

Anticipated Implementation Date (if different from Court date): n/a

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure

Attachments (if applicable):  County Auditor’s Form 1258B