File #: 26-3276    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/7/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request by the Office of the Purchasing Agent for approval of an award on the basis of best proposal meeting requirements with MBN ENTERPRISES, LLC and Mc2 Civil, LLC in the amount of $40,000,000 for construction and maintenance of various roadways for Precinct 2, and for the County Clerk to execute any applicable bonds to be received for the budgeted amount (260099), MWBE Contracted Goal: 33%.
Attachments: 1. 26-3276-SUPPLEMENTAL Award Job No. 260099 - Multiple Vendors.pdf

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia

 

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 260099

Vendor/Entity Legal Name (if applicable): MBN ENTERPRISES, LLC; Mc2 Civil, LLC

 

MWBE Contracted Goal (if applicable): 33%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request by the Office of the Purchasing Agent for approval of an award on the basis of best proposal meeting requirements with MBN ENTERPRISES, LLC and Mc2 Civil, LLC in the amount of $40,000,000 for construction and maintenance of various roadways for Precinct 2, and for the County Clerk to execute any applicable bonds to be received for the budgeted amount (260099), MWBE Contracted Goal: 33%.

end

 

Background and Discussion:

On February 17, 2026, Harris County Precinct 2 submitted a BetterStreets2Neighborhoods (BS2N) project request to the Office of the County Engineer to address severely deteriorated roadway conditions through the replacement of concrete pavement panels and the application of asphalt mill and overlay treatments throughout multiple subdivisions of residential streets in Precinct 2.

 

Expected Impact:

The expected impact of this project is to identify the most critical roadway segments and perform necessary rehabilitation, including concrete panel replacement and asphalt mill and overlay, as funding allows. No engineering design work is required for this effort. The selected on-call contractor will complete construction of prioritized segments to maximize improvements within the available budget, thereby enhancing drivability, safety, and overall roadway conditions.

 

Alternative Options:

Alternative options include Precinct 2 identifying other funding or maintenance resources for these residential subdivisions, such as rebidding the project or utilizing other available on-call contracts.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/16/2026

282

Request for approval of a project scheduled for advertisement for construction and maintenance of various roadways for Precinct 2 (260099).

 

Location:

Address (if applicable): Precinct 2

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Concrete roadway maintenance

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$40,000,000

$40,000,000

$40,000,000

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$40,000,000

$40,000,000

$40,000,000

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$40,000,000

$40,000,000

$40,000,000

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 5/14/2026

 

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM Chief of Engineering and Architectural Services. Kenneth Jackson, Sourcing Manager, Purchasing Services.

 

Attachments (if applicable): Letter, Bid Tab