Legislation Details

File #: 25-0896    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/24/2025 In control: Commissioners Court
On agenda: 2/6/2025 Final action: 2/6/2025
Title: Request for approval to execute an agreement with LJA Engineering, Inc. in the amount of $1,643,000.00 for Professional Engineering Services in connection with the Fairmont Parkway - 4 - From Driftwood Drive to 14th Street - 2024 project, UPIN 24102MF3KH01, Precinct 2, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 0.0%.
Sponsors: Mony Hossain
Attachments: 1. 25-0896-Award-UPIN 24102MF3KH01-PSA Fairmont Parkway 4-LJA Engineering Inc

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN: 24102MF3KH01

Vendor/Entity Legal Name (if applicable): LJA Engineering, Inc.

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): 0.0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with LJA Engineering, Inc. in the amount of $1,643,000.00 for Professional Engineering Services in connection with the Fairmont Parkway - 4 - From Driftwood Drive to 14th Street - 2024 project, UPIN 24102MF3KH01, Precinct 2, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 0.0%.

end

 

Background and Discussion:

Fairmont Parkway Segment 4 is part of a four-segment project that includes constructing an additional outside lane in each direction, repair and/or overlay of existing pavement, adding new sidewalks and improve drainage. The project also includes restriping of the UPRR bridges to accommodate the additional lanes and pedestrian traffic. A portion of the project is in the City of La Porte.

 

Expected Impact:

This project seeks to improve transportation and pedestrian mobility by improving road conditions to enhance traffic flow and provide smoother and safer travel for motorists, while also creating a pedestrian-friendly environment by constructing sidewalks, promoting active transportation, and improving overall pedestrian access.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the consultant will not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/04/2024

152 (24-3461)

Request for approval to negotiate with LJA Engineering, Inc. for professional engineering design services in connection with Segment 4 of Fairmont Parkway Improvements from Driftwood Drive to South 14th Street, UPIN 24102MF34H01, Precinct 2.

 

Location: Fairmont Parkway - Driftwood Drive (400’ east of Driftwood Drive) to 14th Street

Address (if applicable):  N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

$1,643,000

$1,643,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,643,000

$1,643,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,643,000

$1,643,000

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/6/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Professional Services Agreement