Title: Request by the Office of the County Engineer for approval to submit an application to the United States Department of Transportation (USDOT) for grant funds in the amount of $25,000,000, with no required local match, for the FY 2025 Better Utilizing Investments to Leverage Development (BUILD) Grant Program (Telge Road Reconstruction Project, Precinct 4).
Attachments: 1. FINAL PCT4 Backup Court Action FY25-BUILD.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant - Application

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval to submit an application to the United States Department of Transportation (USDOT) for grant funds in the amount of $25,000,000, with no required local match, for the FY 2025 Better Utilizing Investments to Leverage Development (BUILD) Grant Program (Telge Road Reconstruction Project, Precinct 4).

end

 

Background and Discussion:

The transformation of Telge Road is essential as it transitions from a rural route to a busy corridor accommodating both residential and commercial traffic. Originally constructed in 1953 for a significantly smaller population, the road now serves nearly 15,000 daily commuters and struggles to meet modern demands. With outdated infrastructure, hazardous intersections, and frequent flooding, the road has become prone to accidents and closures, posing risks to drivers and hindering the region’s growth.

 

The planned reconstruction of Telge Road from FM 2920 to SH 99 will improve mobility, safety, and economic growth while alleviating persistent congestion. The project includes upgrading the road to a modern, four-lane divided boulevard with enhanced intersections, wider lanes, and advanced drainage systems. More than just an expansion, this transformation will create a multimodal corridor, incorporating sidewalks and shared-use paths to improve community connectivity.

 

Expected Impact:

The submission of this project application will allow Harris County to address congestion, accessibility, connectivity, economic competitiveness, resiliency, and reduction in flooding, and improved safety on Telge Road corridor in a continuously growing area.

 

Alternative Options:

To not apply for the FY 2025 BUILD Grant and pursue the proposed project with local funding.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

 

 

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Telge Road from FM 2920 to SH 99

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

FY 2025 Better Utilizing Investments to Leverage Development (BUILD) Grant Program

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:  Choose an item.

$

$

$

   4 - Years

Grant Funds Applied for/Awarded (Total)

$

$

$25,000,000

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): 1/5/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Director of Community Planning and Transportation, Harris County Engineering Department

 

Attachments (if applicable): Letter of Funding Commitment, FY-25 Project Budget, and Project Description