Harris County Logo
File #: 25-2165    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/26/2025 In control: Commissioners Court
On agenda: 4/10/2025 Final action: 4/10/2025
Title: Request for approval of an agreement with DCCM North America, LLC, in the amount of $998,740, for engineering services to quantify standardized benefits for the design and construction of Flood Control District projects (Project ID Z100-00-00-Y127, Bond ID Z-03, Agreement No. 2024-71, Countywide, MWBE Contracted Goal: 19.60%).
Attachments: 1. 041025 AGMT DCCM 2024-71 CW backup.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): Z100-00-00-Y127

Vendor/Entity Legal Name (if applicable): DCCM North America, LLC

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with DCCM North America, LLC, in the amount of $998,740, for engineering services to quantify standardized benefits for the design and construction of Flood Control District projects (Project ID Z100-00-00-Y127, Bond ID Z-03, Agreement No. 2024-71, Countywide, MWBE Contracted Goal: 19.60%).

end

 

Background and Discussion:

The Flood Control District recently developed guidelines to standardize the tracking of benefits for completed flood risk reduction projects. This agreement will apply use those guidelines to quantify, and document project benefits including (1) Structures benefitted by the project,  (2) Population benefitted by the project including LMI, SVI and R/ECAP data (3) Miles of Inundated Roadways moving from impassable to passable, (4) Acres of land removed from the floodplain, (5) Channel System Capacity pre and post project and (5) Avoided Damages. This agreement will also develop the first phase of a GIS data delivery dashboard for the standard benefit information. 

 

Expected Impact:

The agreement will determine Standard Benefits for projects so that the Flood Control District can accurately and consistently document as well as communicate the flood reduction benefits to the community.

 

Alternative Options:

The alternative to approving this item would be to not utilize and implement the Standard Benefits guidelines, which would result in not documenting Standard Benefits for projects thus not being able to communicate those flood reduction benefits to the community and elected officials.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H2: Evaluate the feasibility and potential impacts of substantial, large-scale flood mitigation measures to provide equitable and transformational regional benefits.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: This action meets the following goals of Objective H:

i.                     Decrease the number of structures in the 100-year floodplain (based on updated FEMA maps once released)

ii.                     Increase the percentage of new flood control projects in zip codes with LMI at 71% or higher

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/12/2024

114.

ATN

 

Location: N/A

Address (if applicable):

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

4.a.8 - Hydrologic Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$485,650

$485,650

$

Tax Revenue - FCD

$

$513,090

$513,090

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$998,740

$998,740

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$998,740

$998,740

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 4/10/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement