Legislation Details

File #: 26-1559    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/23/2026 In control: Commissioners Court
On agenda: 3/4/2026 Final action: 3/4/2026
Title: Request for approval of an award on the basis of best proposal meeting requirements to FMG Construction Group LLC in the amount of $2,228,375 for renovation and reconstruction of a concession stand and various restrooms at Meyer Park for Precinct 3, and for the County Clerk to execute any applicable bonds to be received (250289), MWBE Contracted Goal: 19.60%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom Ramsey 

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 250289

Vendor/Entity Legal Name (if applicable): FMG Construction Group LLC

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

 Request for approval of an award on the basis of best proposal meeting requirements to FMG Construction Group LLC in the amount of $2,228,375 for renovation and reconstruction of a concession stand and various restrooms at Meyer Park for Precinct 3, and for the County Clerk to execute any applicable bonds to be received (250289), MWBE Contracted Goal: 19.60%.

end

 

Background and Discussion:

Precinct-3 intends to construct two new restroom/concession stand buildings at Meyer Park (7700 Cypresswood Dr., Spring, TX 77379). The new restroom/concession stand buildings will replace the old, dilapidated buildings. The new buildings will be provided with conditioned restrooms for the Precinct-3 residents.

 

Request for approval to award FMG Construction Group, LLC for the construction of two new buildings (Building #2 & Building #3) located at Meyer Park (7700 Cypresswood Dr., Spring, TX 77379) in the amount of $2,228,374.89 for Precinct-3.

 

Expected Impact:

The award of this contract will result in the construction of additional restroom replacing the old structure at Meyer Park (7700 Cypresswood Dr., Spring, TX 77379). The new construction will be for Building#2 and Building#3 only. The new restroom buildings will provide visitors to the parks with improved facilities.

 

Alternative Options:

Non available, current buildings are long overdue for replacement.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  H4: Consistently embed sustainability considerations in the project planning and design process.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/12/2024

94

Approved the agreement with Page Southerland Page as a design consultant, UPIN 24103MF3G401, P3

10/08/2024

104

Request for approval to negotiate with Page Southerland Page, LLP for Professional Architectural/Engineering design services in connection with the Meyer Park and Dyess Park-Restroom Improvements projects, UPIN 24103MF3G401, P3

 

Location:

Address (if applicable): 7700 Cypresswood Dr., Spring, Texas 77379 (Meyer Park)

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper

$

$2,228,374.89

$2,228,374.89

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$2,228,374.89

$2,228,374.89

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 3/4/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Alia Haroon, Project Manager, Facilities Design and Construction; Erwin Burden, Chief, Engineering & Architecture Services. Kenneth Jackson, Sourcing Manager, Purchasing Services.

 

Attachments (if applicable): Letter