Legislation Details

File #: 24-7676    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 11/27/2024 In control: Commissioners Court
On agenda: 12/10/2024 Final action: 12/10/2024
Title: Request for approval to execute a Service Outlet Location (SOL) with CenterPoint Energy to Install ten (10) braces on the primary poles along Sheridan Rd from Indian Spring Trl to E Mt Houston Rd, in connection with Asphalt Reconstruction Project - ShadowLake Subdivision - 2022, UPIN 23101MF2MQ01, Precinct 1.
Attachments: 1. 24-7676-UA-UPIN 23101MF2MQ01- CNP Elec SOL-12-10-2024

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

 

Project ID (if applicable): 23101MF2MQ01

Vendor/Entity Legal Name (if applicable): CenterPoint Energy

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to execute a Service Outlet Location (SOL) with CenterPoint Energy to Install ten (10) braces on the primary poles along Sheridan Rd from Indian Spring Trl to E Mt Houston Rd, in connection with Asphalt Reconstruction Project - ShadowLake Subdivision - 2022, UPIN 23101MF2MQ01, Precinct 1.

end

 

Background and Discussion:

The project includes Asphalt roadway reconstruction, base repairs, mill and overlays, ditch regrading, culvert replacements, and adjustments. The Project Limits are along the Sheridan Dr and all streets from Tomahawk Trail to E Mt Houston Rd.
A section along
the Sheridan Dr as part of side ditch regrading which is in the Harris County ROW. CenterPoint Energy to install Brace and remove all braces after conclusion of the project.

Expected Impact:

This action allows the continuation of the contracted work.

 

Alternative Options:

If no action is taken, the project may experience construction delays.

Alignment with Goal(s):

   Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Sheridan Dr from Indian Spring Trl to E Mt Houston Rd

Address (if applicable): 11998 Sheridan Rd, Houston, Tx, 77044.

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: December 10, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Cassandra Green, Director, Technical Services, Harris County Engineering Department

 

Attachments (if applicable): Pole Brace - CNP Elec - COMBINED SKETCH