Harris County Logo
File #: 24-5896    Version: 1 Name:
Type: Investment Memo Status: Passed
File created: 9/7/2024 In control: Commissioners Court
On agenda: 9/19/2024 Final action: 9/19/2024
Title: Request for approval of a Change Investment Memo for the Precinct 1 FY24-25 General Use CIP project in the increased amount of $2,132,000 for a total authorization of $15,000,000.

Department: Commissioner, Precinct 1

Department Head: Rodney Ellis

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Investment Memo

Investment Memo Type: Change Investment Memo

 

Project Name: Precinct 1 FY24-25 General Use CIP

Project ID (if applicable): N/A

Vendor Legal Name (if applicable): N/A

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Achievement (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Managing Entity: Commissioner, Precinct 1

Incremental Authorization Requested: $2,132,000

Total Estimated Project Cost: 15,000,000

 

Request Summary:

title

Request for approval of a Change Investment Memo for the Precinct 1 FY24-25 General Use CIP project in the increased amount of $2,132,000 for a total authorization of $15,000,000.

end

Project Description:

This change in investment memo updates the list of projects submitted to the court on 6/25/24. The project list includes infrastructure and essential equipment to enhance operational efficiency and service delivery within Precinct One. The projects are divided into four tranches based on the expected time of delivery. They are for the maintenance and renovation of existing Precinct One Community Center--s, infrastructure, and buildings to improve safety for constituents and employees, regulatory compliance, and enhanced functionality. These strategic investments are vital for maintaining infrastructure, enhancing service delivery, and supporting the community's evolving needs.

Project Scope:

 

 

 

 

Tranche 1:

Type

  Project Amount 

Project Name/Location

Justification

REPAIR AND MAINT TO BLDGS

$105,000

SCADA System/ Lift Station Maintenance and Renovation

Remote monitoring for 16 lift stations.

EQUIPMENT REPAIR AND MAINT

$226,000

Water Facility/ Miller, Tom Bass, and Deussen

Conduct a design review for water and wastewater infrastructure to identify upgrades and repairs systems.

EQUIPMENT REPAIR AND MAINT

$89,000

Grease Traps /Adair, EFL Park and Tom Bass

Conduct a design review for engineering grease projects to determine status of existing grease traps and replacement or repair to existing grease traps.

REPAIR AND MAINT TO BLDGS

$50,000

EL FRANCO LEE COMMUNITY CENTER

Replace VCT Flooring

REPAIR AND MAINT TO BLDGS

$35,000

EL FRANCO LEE PARK

Re-Roof comp shingle roof at El Franco Lee Park BBQ Pav and Boardwalk Repair for Senior Mobility

REPAIR AND MAINT TO BLDGS

$175,000

EL RIO ADMIN Building

Structural repair to failing wall at El Rio Admin Building

REPAIR AND MAINT TO BLDGS

$2,225,000

BADGE ACCESS COMMUNITY CENTERS

Replace key access with badge Access Control at all community centers.

REPAIR AND MAINT TO BLDGS

$150,000

PCT FENCE REPAIR

Park Fence repairs and replacement: Adair, Alabonson, Bane, and Tom Bass I Park

REPAIR AND MAINT TO BLDGS

$150,000

FOSTER STREET

Foster Street - Exterior Window Replacement

REPAIR AND MAINT TO BLDGS

$400,000

REED ROAD

Reed Road - Roof repairs, HVAC, insulation and exterior window replacement

REPAIR AND MAINT TO BLDGS

$75,000

Finnigan Park

Finnigan Park, Bleacher and Dugout repairs

REPAIR AND MAINT TO BLDGS

$104,000

Danny Jackson Dog Park

Install plumbing and concrete base of dog pool to prevent further deepening.

REPAIR AND MAINT TO BLDGS

$375,000

EL RIO SERVICE CENTER

HVAC, door replacement walls, insulation, & racks for Forestry Shop Area and Construction Shop buildout to offset storage fees of supplies.

REPAIR AND MAINT TO BLDGS

$200,000

Install ADA Door Operators in all Community Centers  

Perform ADA design review and perform renovations to address ADA compliance, including installing ADA compliant door operators. 

REPAIR AND MAINT TO BLDGS

$45,000

Tom Bass III Community Center

Replace mini blinds and existing worn carpet throughout the building.

Total

 $   4,404,000

 

 

 

 

Tranche 2:

Location

Item

Cost

Tom Bass III

Fence

$150,000

Tom Bass 1 and 3, Adair lift station wet well resealing

8 Lift Stations

$350,000

 

 

 

 

 

 

Tranche 3:

Asset

Project

Cost

Tom Bass I Park

Asbestos abatement and complete remodel of the existing space includes improvements to restrooms, shower, and interior finishes. MEP, Fire Suppression, badge readers, and Security Systems will be brought to code. Roof and gutter system will be refurbished. Plus a 630 SF addition which include space for additional offices and an expansion to the breakroom and shop.

$450,000

Tom Bass II Park

Asbestos abatement and remodel of existing office and shop space including upgrades to shower, restrooms and interior finishes. MEP, Fire Suppression, badge readers, and Security Systems will be compliant with building code. Roof and gutter system will be refurbished.

$350,000

Sheldon Sports Complex Press Box

Provide a built-up slab at grade that will lift the first level up. Door, electrical panel and conduit would be raised and interior repainted to support the raised floor. In addition, construction of swale drainage system as diagramed in this report that will carry water away from the building along the perimeter of the ball field.

$100,000

TOTAL

$900,000

 

Tranche 4:

Asset

Project

Cost

El Camino

Renovate the existing office building to a community center that will provide programming and meeting space for constituents.

$3,000,000

Tom Bass I Park

D/I Capital Project. Tom Bass Amphitheater Seating Repairs, renovate stage and replace stage equipment, roof extension over stage, interior renovations of bathroom and dressing room, replace landscaping, and fencing.

$3,500,000

 

Contingency for all 4 tranches

$2,696,000

Note: Certain work packages will be completed after the end of FY25 but purchase orders will need to be encumbered in FY25 to ensure on-time delivery & installation, and thus are included in the incremental ask.

Justification:

This project is divided into 4 parts to address key operational and infrastructure needs. The first part focuses on the maintenance and renovation of existing Precinct One Community Centers and buildings. The second and fourth part involves renovating and upgrading various facilities to ensure safety, regulatory compliance, and enhanced functionality. The third part will replace fences to maintain security and aesthetic appeal in public areas. These strategic investments are vital for maintaining infrastructure, enhancing service delivery, and supporting the community's evolving needs.

Alternatives and Engagement:

Failing to proceed with these four projects would have negative impacts on operational efficiency, infrastructure integrity, and community services. Neglecting the renovation of facilities will result in deteriorating buildings that fail to meet safety and compliance standards, compromising the usability and safety of these spaces. Finally, without replacing fences, the security and aesthetics of public spaces will deteriorate, increasing the risk of vandalism and reducing the community’s sense of safety and pride in their surroundings.

Anticipated Project Expenditures and Timeline:

Scope of Work

Estimated Cost

Estimated Completion

Tranche 1

$4,404,000

Q1 FY25

Tranche 2

$500,000

Q2 FY25

Tranche 3

$900,000

Q3 FY25

Tranche 4

$6,500,000

Q4 FY25

Contingency

$2,696,000

 

Total

$15,000,000

-

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

X Governance and Customer Service

 

Previous Court Action: N/A

Date

Agenda Item #

Action Taken

 

 

 

 

 

 

 

 

 

 

Address: Multiple

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

 

 

 

 

 

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request

 

Commercial Paper

$

15,000,000

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$15,000,000

$

$

Total Funding Request

$

$15,000,000

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/19/2024

Anticipated Implementation Date (if different from Court date): N/A

Legal funding compliance confirmed by: Paige Abernathy, 9/8/2024

Department Approval by: Errika Perkins, CFO, CP1, 8/23/2024

OMB CIP Team Approval by: Amiel Chen, OMB, CIP Manager, 9/6/2024

 

 