Legislation Details

File #: 26-0611    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/13/2026 In control: Commissioners Court
On agenda: 1/29/2026 Final action: 1/29/2026
Title: Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC, in the amount of $63,490.00 for Professional Engineering and related Services in connection with Construction Phase Services of Roadway Maintenance - Asphalt Package - 3 - 2025, UPIN 25103MF3MX01, Precinct 3, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
Attachments: 1. 26-0611- Award-25103MF3MX01- Asphalt Package 3- Pape-Dawson-1.29.26 (2)(hlx)

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 25103MF3MX01

Vendor/Entity Legal Name (if applicable): Pape Dawson Consulting Engineers, Inc.

 

MWBE Contracted Goal (if applicable): 0%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  0% - Non-Divisible

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC, in the amount of $63,490.00 for Professional Engineering and related Services in connection with Construction Phase Services of Roadway Maintenance - Asphalt Package - 3 - 2025, UPIN 25103MF3MX01, Precinct 3, Justification for 0% MWBE Participation Goal:  0% - Non-Divisible.

end

 

Background and Discussion:

Office of the County Engineer to enter into an agreement for professional engineering services to provide Construction Phase services for the subject maintenance project which consists of mill & overlay with base repairs on Jones Road and Woodedge Drive within Precinct 3. The total length of the project is 2 miles of roadway, covering the subject roads. Jones Road is a 6-lane Major thoroughfare with a continuous turn lane within 100ft of ROW with 12-ft lanes and open ditches. Woodedge Dr. is a 2-lane asphalt residential corridor within 60-80ft of ROW, with 11-ft lanes, and open ditches. The scope includes base repairs, mill and overlay, with updated pavement markings, of approximately 2 miles of roadway, covering the subject roads.

 

 

Expected Impact:

 

The maintenance project will improve the road quality for the community in the specified area.

 

Alternative Options:

 

Without this project, the road cannot be maintained properly. The goal is to provide better mobility and/or eliminate hazards from the roadway as requested by the Precinct.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

126 (24-6616)

Authorization to Negotiate

02/08/2025

56 (25-0855)

Request for approval to execute an agreement with Pape-Dawson Engineers, LLC in the amount of $62,835.00 for Professional Engineering and related services in connection with Roadway Maintenance - Asphalt Package -3- 2025, UPIN 25103MF3MX01, Precinct 3, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.

 

Location:

Address (if applicable): Jones Road from north of Cypress North Houston Road to Grant Road; Woodedge Drive from Jones Road to F.M. 1960.

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$ 63,490.00

$ 63,490.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$ 63,490.00

$ 63,490.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$63,490.00

$63,490.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/29/2026

Anticipated Implementation Date (if different from Court date): 1/29/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contract exhibits and Agreement