Title: Request by the Flood Control District for approval to accept from the Texas Water Development Board grant funds in the amount of $16,900,000, with a discretionary match of $4,500,000, for the Poor Farm Ditch Structural Improvements Project. (Brays Bayou Watershed, Bond ID C-12, Project ID D111-00-00-C002, Precinct 1).

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant

 

Project ID (if applicable): D111-00-00-C002

Vendor/Entity Legal Name (if applicable): Texas Water Development Board

 

MWDBE Contracted Goal (if applicable):

MWDBE Current Participation (if applicable):

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request by the Flood Control District for approval to accept from the Texas Water Development Board grant funds in the amount of $16,900,000, with a discretionary match of $4,500,000, for the Poor Farm Ditch Structural Improvements Project. (Brays Bayou Watershed, Bond ID C-12, Project ID D111-00-00-C002, Precinct 1).

end

 

Background and Discussion:

It is recommended that the Flood Control District be authorized to accept the grant award funds in the amount of $16,900,000 from the Texas Water Development Board from Texas legislative action (state Community Directed Funding) to fund the Poor Farm Ditch Conveyance Improvements (D111-00-00-C002).  TWDB funding efforts were led by Rep. Ann Johnson. This project has also received Congressionally directed grant funding assistance from the Federal Emergency Management Agency (FEMA) Legislative Pre-Disaster Mitigation (LPDM) program providing up to $9,886,000 for design and construction.  FEMA funding efforts were led by Rep. Lizzie Fletcher. The remaining cost of $4,500,000 would have to be funded using local funds.

 

The primary goal of the project is to avoid a failure of the existing channel by constructing an entirely new channel structure. The existing concrete channel is over 55 years old and has deteriorated at an accelerated pace, buckled at many locations and is well beyond its useful life. The project reach is within HCFCD ROW varying from 45 feet to 80 feet where encroachments have been constructed within HCFCD's easement, which have also induced loading conditions to the concrete channel. The project reach is situated between the cities of Southside Place and West University Place who are also the project partners alongside with oversight from the City of Houston.

 

Expected Impact:

This grant will provide funding assistance for the Poor Farm Ditch Conveyance Improvements (D111-00-00-C002) through design and construction. The Flood Control District will utilize its resources and applicable consultants during the design and construction phases of the project, as well as the management of the grant approval process in compliance with Harris County statutes, applicable laws of the state of Texas, and policy regarding federal grant awards.

 

Alternative Options:

The alternative would be to not utilize these State Community Directed Funding allocation.  Harris County Flood Control would need to utilize a different funding source to pay for this construction project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

2/27/2014

142.

Approval of Escrow Agreement

 

Location: N/A

This project, the Poor Farm Ditch, is a tributary to Brays Bayou (D100-00-00) with a project reach of approximately 3,100 linear feet and is situated between the cities of West University Place on the east side of the channel and Southside Place on the west side of the channel between University Boulevard and Bellaire Boulevard.

Precinct(s):  Precinct 1

 

Fiscal and Personnel Summary

Service Name

4.a.2 - Construction Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

$4,225,000

$4,225,000

$12,675,000

Other

$

$2,471,000

$2,471,000

$7,415,000

Bonds

$

$1,125,000

$1,125,000

$3,375,000

Total Current Budget

$

$7,821,000

$7,821,000

$23,465,000

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$7,821,000

$7,821,000

$23,465,000

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 4, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Grant Agreement and Order