Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0039, UPIN 19101MF17F01
Vendor/Entity Legal Name (if applicable): iCON GC, LLC
MWBE Contracted Goal (if applicable): 29.78%
MWBE Current Participation (if applicable): 26.29%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with iCON GC, LLC, in connection with Parkway (Mobile Homes) Subdivision Drainage Improvements - 2018, with no change in the amount, Job No. 25/0039-3, HC Road Fund, UPIN 19101MF17F01, Precinct 1, MWBE Contracted Goal: 29.78%, MWBE Current Participation: 26.29%.
end
Background and Discussion:
The Parkway (Mobile Homes) Subdivision is located in Precinct 1, northeast Harris County, north of the intersection of Park Trail Drive and Tidwell Road. The subdivision is a residential mobile home neighborhood consisting of approximately 510 lots. The existing drainage system consists of a concrete curb and gutter which drains to a main trunkline drainage culvert that runs south and ultimately outfalls into HCFCD maintained ditch P122-00-00. The existing drainage pipe system is undersized and causes surface water to back up at the intake areas. This causes localized flooding at the intersections of the roads. Floodplains and Historical Flooding data show 307 homes reported structural flooding due to Hurricane Harvey. The proposed solution includes increasing storm sewer capacity in the existing systems, pavement replacement and constructing a wet bottom detention basin.
The change in contract includes the following:
The line items are adjusted to reconcile overrun, underrun quantities and add new line items to the project for completion of the proposed scope of work.
• The increase of quantities for existing line items 11 and 47 for an addition in the amount of $85,857.00 and zero (0) days.
• The decrease of quantities for existing line items 94, 95, 96, 98 and 101 for a deduction in the amount of $90,997.69 and 0 days.
• Added new line item 127 for Stub-in of existing 8in HDPE into proposed TYP C-1 inlet for an addition in the amount of $5,140.69 and 0 days.
The above additions and deductions result in a net change in the amount of $0.00 and 0 calendar days.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Parkway (Mobile Homes) subdivision.
Alternative Options:
The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H6: Expand neighborhood drainage programs.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
03/05/2025 |
86 (25-1346) |
Transmittal - Advertisement |
|
04/16/2025 |
43 (25-2426) |
Contract Award - iCON GC, LLC |
|
09/18/2025 |
37 (25-5634) |
Contract Amendment (25/0039-1) for additional funds - Bond Fund |
|
01/08/2026 |
45 (26-0197) |
Contract Amendment (25/0039-1) for no change in the amount or extension of project term - HC Road Fund |
|
03/31/2026 |
5 (26-2081) |
Contract Amendment (25/0039-1) for additional funds - Commercial Paper Fund |
|
03/31/2026 |
6 (26-2082) |
Contract Amendment (25/0039-2) for no change in the amount or extension of project term - HC Road Fund |
Location: Parkway (Mobile Homes) Subdivision
Address (if applicable): N/A
Precinct(s): Precinct 1
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 5/28/2026
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): Change in Contract (CIC)