File #: 21-1300    Version: 1 Name:
Type: Consultant Agreement Status: Passed
File created: 3/23/2021 In control: Commissioners Court
On agenda: 3/30/2021 Final action: 3/30/2021
Title: Recommendation that the County Judge execute an agreement with R. G Miller Engineers, Inc. in the amount of $42,823 for Professional Engineering and related services to construct Emerald Forest Subdivisions Road and Drainage Improvements to Brandywine Oaks located in Precinct 3 (UPIN 19103N303001).
Attachments: 1. 21-1300 Consultant - R. G. Miller Engineer, Inc. P3

 

To:                                                               Harris County Commissioners Court

 

Through:                                          John R. Blount, P.E., County Engineer, Office of the County Engineer

prepared

Prepared By:                                          Veronica H. Thomas, Manager, Office of the County Engineer

 

Subject:                                           Consultant Agreement- R. G. Miller Engineers, Inc. - Emerald Forest

end

Project ID (If applicable]: E100-00-00-HC013

 

Purpose and Request:

title

Recommendation that the County Judge execute an agreement with R. G Miller Engineers, Inc. in the amount of $42,823 for Professional Engineering and related services to construct Emerald Forest Subdivisions Road and Drainage Improvements to Brandywine Oaks located in Precinct 3 (UPIN 19103N303001).

end

 

Background and Discussion:

The Brandywine Oaks Subdivision is part of the larger Emerald Forest projects. The subdivision in existing condition has no drainage system and currently operates with dirt roads that fail to allow access during rain events as they get too muddy and flooded to allow vehicles to pass through. The subdivision requires asphalt roads to allow the required access as well as underground storm sewer through reinforced concrete boxes to tie into the overall Emerald Forest drainage system at the Cypress Place Phase 1 project outfall. The main road, Cypress Trail, will also receive sidewalks. Once these improvements are complete, access will be available during storm events and there will be a reduction to structural flooding.

 

Fiscal Impact:

A total of $42,823.00 is being requested by HCFCD through the 2018 bond program to fund the Construction Phase Services of this project. This subdivision was identified by the Recovery and Resiliency Division as one of the Subdivision Drainage Improvement projects that would require 2018 bond program funding.

 

Fiscal Summary

 Expenditures

FY 20-21

FY 21-22 Projected

Future Years Projected [3 additional years]

Service Impacted:  HCFCD

 

 

 

Existing Budget

 

 

 

Additional Appropriation Requested

 

 

 

Total Expenditures

 

 

 

Funding Sources

 

 

 

Existing Department Budget

 

 

 

Please Identify Funding Source (General Fund, PIC, Special Revenue, Grant, Etc.)

 

 

 

20148 HCFCD Bond Program - Z - Subdivision]*

 

42,823

 

Total Sources

 

42,823

 

Alternatives:

 There are no alternatives for this project or the Professional Services Agreement for Construction Phase Services. The subdivision in existing condition has no drainage system and currently operates with dirt roads that fail to allow access during rain events as they get too muddy and flooded to allow vehicles to pass through. The subdivision requires asphalt roads to allow the required access as well as underground storm sewer to tie into the overall Emerald Forest drainage system at the Cypress Place Phase 1 project outfall.

  Alignment with Strategic Objective:

Subdivision drainage improvement project as part of the HCFCD 2018 Bond Program.

Attachments:

Consultant Agreement