Legislation Details

File #: 26-7672    Version: 1 Name:
Type: Public Necessity Status: Agenda Ready
File created: 11/6/2026 In control: Commissioners Court
On agenda: 11/19/2026 Final action:
Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, two (2) fee simple tracts for the public project known as Katy Trees Regional Detention Basin Acquisition, for the purpose of detention improvements, UPIN 26104NULIC01, Precinct 4.
Attachments: 1. 26-7672-(PN)-26104NULIC01-KatyTreesRegDetBasin-P4-11-19-26.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not applicable

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

 

Project ID (if applicable): 26104NULIC01

Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

 

MWBE Contracted Goal (if applicable): Not applicable

MWBE Current Participation (if applicable): Not applicable

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): Not applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, two (2) fee simple tracts for the public project known as Katy Trees Regional Detention Basin Acquisition, for the purpose of detention improvements, UPIN 26104NULIC01, Precinct 4.

end

 

Background and Discussion:

Cane Island Branch is a waterway conveying flows through Harris, Fort Bend and Waller Counties plus the City of Katy.  Lands adjacent to this waterway experience flooding during major storm events. Given the development occurring within these municipalities, the impacts of flooding on residences will be significantly increased during future storm events.

 

Management of Cane Island Branch and it's surrounding watershed is the responsibility of the Brookshire Katy Drainage District (BKDD). BKDD's master drainage plan for Cane Island Branch envisions construction of a regional detention basin north and upstream of the City of Katy.

 

Four contiguous tracts of land, termed the Katy Trees tract, have been identified as the location of this detention basin. The total size of the Katy Trees tract is approximately 82 acres. Once purchased, these tracts of land will be utilized by the BKDD to construct a regional detention basin when funding is available. 

 

Expected Impact:

This project, once the regional detention basin has been constructed, help reduce the impact of flooding along Cane Island Branch.  Flood mitigation benefits from the project will be seen not only by residents of Harris County, but also within the City of Katy, Fort Bend County and Waller County.  

 

Alternative Options:

Acquisition of the tracts would be terminated.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: R: Enhance disaster preparedness, response, recovery, and resiliency.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 0 Pitts Road, 0 ClayRd, & 0 Eula Road, Katy, TX 77493

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/19/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Dr. F. Mike Etienne, Chief of Planning and Development Services, Office of the County Engineer

 

 

Attachments (if applicable): Findings and Declarations; Metes and Bounds & Survey Map