Title: Request for approval of an award on the basis of low bid to RES Gulf Coast, LLC dba LECON, Inc. in the amount of $158,104 for the construction price, with owner contingency in the amount of $12,628, for installation of 60" reinforced concrete pipe cast iron flap gate with headwall & wingwalls for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received for the construction price (240272), MWDBE Contracted Goal: 15.75%.

Department: Purchasing

Department Head/Elected Official: Paige McInnis

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 240272

Vendor/Entity Legal Name (if applicable): RES Gulf Coast, LLC dba LECON, Inc.                     

 

MWDBE Contracted Goal (if applicable): 15.75%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to RES Gulf Coast, LLC dba LECON, Inc. in the amount of $158,104 for the construction price, with owner contingency in the amount of $12,628, for installation of 60” reinforced concrete pipe cast iron flap gate with headwall & wingwalls for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received for the construction price (240272), MWDBE Contracted Goal: 15.75%.

end

 

Background and Discussion:

The project is a 60” RCP Cast Iron Flap Gate with Headwall & Wingwalls in northeast Harris County.  This construction project will remove the damaged 60” Tideflex Valve to P124-00-00 from the adjoining drainage area and replace it with a 60” Cast Iron Flap Gate.   This replacement will be in compliance with a settlement to control the flow of offsite drainage to P124-00-00 during high flow events.

 

Expected Impact:

The existing 60” Tideflex Valve stopped sealing properly.  This valve replacement project will remove the damaged flex valve and standardize the operation to a flap gate.  The flap gate will be located back into the side berm of the channel to minimize obstruction to flow in P124-00-00 versus the current flex valve position in the center of the channel. 

 

Alternative Options:

There are no viable alternatives to this item being requested.  Not approving would allow the existing valve to deteriorate and discharge from P124-00-00 to the adjoining basin, P500-01-00 during peak flows.  This could cause an increase flood risk to the surrounding area which would violate the settlement agreement.

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/06/2024

354

Transmittal by Purchasing of a project scheduled for advertising

 

Location: N/A

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other O&M

$

$170,732.00

$170,732.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$170,732.00

$170,732.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: October 8, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Helen Stallkamp, P.E., Project Manager, HCFCD, Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter