Legislation Details

File #: 24-3309    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 5/23/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of an agreement with Brooks & Sparks, Inc., in the amount of $795,124.30, for engineering services to provide design, bidding, and construction phase engineering services in support of a stormwater detention basin along South Mayde Creek at HCFCD Unit U501-06-00. (Addicks Reservoir Watershed, Bond ID C-46, Project ID U501-06-00-E001, Agreement No. 2024-33, Precinct 4, MWDBE Contracted Goal: 19.865%).
Attachments: 1. 060424 AMGT BROOKS SPARKS 2024-33 PCT 4 backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): U501-06-00-E001

Vendor/Entity Legal Name (if applicable): Brooks & Sparks, Inc.

 

MWDBE Contracted Goal (if applicable): 19.865%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with Brooks & Sparks, Inc., in the amount of $795,124.30, for engineering services to provide design, bidding, and construction phase engineering services in support of a stormwater detention basin along South Mayde Creek at HCFCD Unit U501-06-00. (Addicks Reservoir Watershed, Bond ID C-46, Project ID U501-06-00-E001, Agreement No. 2024-33, Precinct 4, MWDBE Contracted Goal: 19.865%).

end

 

Background and Discussion:

This agreement includes design, bidding, and construction phase engineering services for a stormwater detention basin. Construction of the Basin will be completed with CDBG-MIT funding. This is the first phase of the ultimate project, which consists of two planned stormwater detention basins at the site. This project occurs in the 3rd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

 

Expected Impact:

This project seeks to reduce flood risks and strengthen resiliency in the Addicks Reservoir Watershed by alleviating property and structural damage to adjacent communities.

 

Alternative Options:

The alternative would be to select other firms for this assignment which would result in significant delays in completing this project, impacting CDBG deadlines.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/13/2018

2.b.6

ATN

03/26/2019

2.a.8

Agreement

09/28/2021

104.

Acquisition of two tracts

 

Location: South Mayde Creek (U101-00-00)

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$795,124.30

$795,124.30

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$795,124.30

$795,124.30

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$795,124.30

$795,124.30

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 4, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement and Map