Legislation Details

File #: 25-4382    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/1/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request for approval of a change in contract with Texas Materials Group, Inc., in connection with final construction of Asphalt Package 2023-2, adding 132 calendar days, with a deduction in the amount of $410,133.01, Job No. 23/0293-1, UPIN 23103MF2WQ01, Precinct 3, MWBE Contracted Goal: 33%, MWBE Current Participation: 14.17%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0293, UPIN 23103MF2WQ01

Vendor/Entity Legal Name (if applicable): Texas Materials Group, Inc.

 

MWBE Contracted Goal (if applicable): 33%

MWBE Current Participation (if applicable): 14.17%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Texas Materials Group, Inc., in connection with final construction of Asphalt Package 2023-2, adding 132 calendar days, with a deduction in the amount of $410,133.01, Job No. 23/0293-1, UPIN 23103MF2WQ01, Precinct 3, MWBE Contracted Goal: 33%, MWBE Current Participation: 14.17%.

end

 

Background and Discussion:

Project includes roadway rehabilitation, mill, and overlay with base repair for Dallas Road, Louis Road, Old Atascocita Road, Parish Road, Marshall Road, and Smith Street.

 

The change in contract includes the following:

•                     Addition of 132 days for encountering extra base repair, installation of bridge headwalls and delay caused by CenterPoint operation on Old Atascocita Road, installation of Guardrail and CMP extension on Dallas Hanna Nash Road, and subgrade installation on Smith Road (132 days). 

•                     The final adjustment (reconciliation of actual quantities used in construction against the bid quantities). (-$410,133.01).

 

Expected Impact:

Change allows unused funds to be returned to Harris County and allows the Contractor to be compensated.

 

Alternative Options:

Maintain the original scope of the project.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/29/2023

469 (23-5141)

Contract Award

03/27/2025

530 (25-1459)

Substantial Completion

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

-$410,133.01

-$410,133.01

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$410,133.01

-$410,133.01

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$410,133.01

-$410,133.01

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/7/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B