Legislation Details

File #: 24-7249    Version: 1 Name:
Type: Dedication Status: Passed
File created: 11/1/2024 In control: Commissioners Court
On agenda: 11/12/2024 Final action: 11/12/2024
Title: Request for approval for Harris County to dedicate a detention basin and flood control drainage easement of 29.4610 acres of land, tract A100-00-00-24-008.0 for public purpose for the construction of a regional basin to the Harris County Flood Control District, from Friendswood Regional Stormwater Detention Basin - A500-09-00-E001, tract A100-00-00-24-008.0 and that the County Judge execute the detention basin and flood control drainage easement, UPIN 24090MF3F401, Precinct 2.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Dedication

 

Project ID (if applicable): 24090MF3F401

Vendor/Entity Legal Name (if applicable): Harris County Flood Control District

 

MWDBE Contracted Goal (if applicable): Not Applicable

MWDBE Current Participation (if applicable): Not Applicable

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval for Harris County to dedicate a detention basin and flood control drainage easement of 29.4610 acres of land, tract A100-00-00-24-008.0 for public purpose for the construction of a regional basin to the Harris County Flood Control District, from Friendswood Regional Stormwater Detention Basin - A500-09-00-E001, tract A100-00-00-24-008.0 and that the County Judge execute the detention basin and flood control drainage easement, UPIN 24090MF3F401, Precinct 2.

end

 

Background and Discussion:

The project area is approximately 105 acres in Southwestern Harris County within Precinct 2 inside the City of Friendswood limits at Clear Creek Watershed. Project is bounded by Dixie Farm Road to the North and Clear Creek Channel (A100-00-00) to the West and South, and Beamer Road to the East. This project is the partnership project between the City of Friendswood, Galveston County, Galveston Consolidated Drainage District and Harris County Flood Control District. The overall objective of this project is to reduce the overall peak flows and decrease the water surface elevation along Clear Creek Channel (A100-00-00). Three alternatives were evaluated.

 

Expected Impact:

Provide design, bidding, and construction phase services for the project. The alternative 2 removed 87 flooded structures from the floodplain and removed 2,644 structures flooding depth for a 100-year level of service.

 

Alternative Options:

The alternative option does not proceed to the final design phase of this project. Flood risk in the project area would remain the same.

 

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

X Governance and Customer Service

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 0 Dixie Farm Rd. Houston Tx, 77089

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

 

 

 

 

Anticipated Court Date: November 12, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Michael Ware, Director, Real Property Division

Attachments (if applicable): Detention Basin and Flood Control Drainage Easement with Exhibit; Location Map