File #: 26-1833    Version: 1 Name:
Type: Grant Status: Passed
File created: 3/6/2026 In control: Commissioners Court
On agenda: 3/19/2026 Final action: 3/19/2026
Title: Request by the Flood Control District for approval to accept an amendment to an agreement with the United States Environmental Protection Agency (EPA) State and Tribal Assistance Grant (STAG) to extend the grant end date to December 31, 2027 for the Kingwood Diversion Ditch Channel Improvement Project (San Jacinto River Watershed, Bond ID F-14, Project ID G103-38-00-E001, Precinct 3).
Attachments: 1. G103-38-00-E001 Kingwood diversion - EPA STAG - Amendment Attachments.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant - Amendment

 

Project ID (if applicable): G103-38-00-E001

Vendor/Entity Legal Name (if applicable): U.S. Environmental Protection Agency

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request by the Flood Control District for approval to accept an amendment to an agreement with the United States Environmental Protection Agency (EPA) State and Tribal Assistance Grant (STAG) to extend the grant end date to December 31, 2027 for the Kingwood Diversion Ditch Channel Improvement Project (San Jacinto River Watershed, Bond ID F-14, Project ID G103-38-00-E001, Precinct 3).

end

 

Background and Discussion:

This grant amendment will extend the period of performance by one year to 12/31/2027 and continue to provide financial assistance to the Flood Control District for the Kingwood Diversion Ditch Channel Improvement Project. The amendment extends the period of performance by 20 months with no change in funding. 

 

Expected Impact:

This grant will continue to fund the project through design. The proposed G103-38-00-E001 Kingwood Diversion Ditch Channel Improvement Project is expected to reduce the 100-year floodplain by 223 acres, removing up to 69 structures from the floodplain and lowering the water surface elevation for the structures in the floodplain. The Flood Control District will utilize its resources and applicable consultants during the project, as well as the management of the grant approval process in compliance with Harris County statutes, applicable laws of the state of Texas, and Policy regarding Federal Grant Awards.  

 

Alternative Options:

The alternatives are: 1) not to accept the grant amendment, wherein awarded unused grant funding would be returned to EPA at the end of the existing period of performance on April 1, 2026, and projects lose funding, and 2) the projects’ design will need to be funded entirely with local funding.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: This action is consistent with the Strategic Plan overarching goals of reducing the number of structures at risk of flooding and improving the quality of life of Harris County residents.

 

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/23/2024

268.

Application

10/29/2024

257.

Award

 

Location: Northeast Harris County G103-38-00 Channel from approximately Hamblen Rd to Northpark Drive

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

$1,600,000

$1,600,000

$

Bonds

$

$400,000

$400,000

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$2,000,000

$2,000,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$2,000,000

$2,000,000

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 3/19/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Order, Grant Amendment