File #: 24-3585    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/10/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with final construction of Schiel Road 1 - from East of SH-99 to West of Fairfield Place Drive, adding five calendar days, with a deduction in the amount of $93,443.22, Job No. 22/0344-3, UPIN 18103N302202, Precinct 3, MWDBE Contracted Goal: 100%, MWDBE Current Participation: 100%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0344, UPIN 18103N302202

Vendor/Entity Legal Name (if applicable): Sequeira Civil Construction, LLC

 

MWDBE Contracted Goal (if applicable): 100%

MWDBE Current Participation (if applicable): 100%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with final construction of Schiel Road 1 - from East of SH-99 to West of Fairfield Place Drive, adding five calendar days, with a deduction in the amount of $93,443.22, Job No. 22/0344-3, UPIN 18103N302202, Precinct 3, MWDBE Contracted Goal: 100%, MWDBE Current Participation: 100%.

end

 

Background and Discussion:

The project includes construction of a standard 4-lane concrete boulevard section on Schiel Road, from East of State Highway 99 to West of Fairfield Place Drive.


This change in contracts includes:

 

•                     Cost of furnish and installation of pipe gates in front of Harris County Flood Control District access road. ($22,295.54)

 

•                     Cost and time for tie in offsite drainage pipe to the back of an inlet in front of soccer field at west end of the project. ($7,162.85 - 2 days)

 

•                     Cost and time for installation of urban interceptor at the end of 24-inch pipe between TXDOT right of way and detention pond. ($12,499.64 - 3 days).

 

•                     The final adjustment (reconciliation of actual quantities used in construction against the bid quantities). Total = -$135,401.22

 

 

 

 

 

 

Expected Impact:

Change allows unused funds to be returned to Harris County and allows the Contractor to be compensated for actual work.

 

Alternative Options:

Maintain the original scope of the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/15/2022

22-6984

Contract Award

05/16/2023

23-2887

Contract Amendment for additional funds

07/18/2023

23-4018

Contract Amendment for additional funds and extension of project term

 

Location: Schiel Road

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund 3109

$

-$93,443.22

-$93,443.22

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

-$93,443.22

-$93,443.22

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

-$93,443.22

-$93,443.22

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B