Legislation Details

File #: 25-6800    Version: 1 Name:
Type: Report Status: Passed
File created: 10/15/2025 In control: Commissioners Court
On agenda: 10/30/2025 Final action: 10/30/2025
Title: Request for approval of a Study Report prepared by AKV Consultants LLC for Market Street from Lakeside Drive to Magnolia Street, UPIN 23102MF2UQ01, Precinct 2.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: Choose an item.

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): 23102MF2UQ01

Vendor/Entity Legal Name (if applicable): AKV Consultants LLC

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of a Study Report prepared by AKV Consultants LLC for Market Street from Lakeside Drive to Magnolia Street, UPIN 23102MF2UQ01, Precinct 2.

end

 

Background and Discussion:

The project in East Harris County, consists of approximately 5,725 Linear lengths of roadway. AKV Consultants LLC was awarded a contract to provide roadway reconstruction and related improvements along Market Street from Lakeside Drive to Magnolia Street. The goal is to study the existing conditions of Market Street and provide best reconstruction options. Based on that agreement, AKV Consultants LLC submitted the final study report on February 13, 2025.

 

Expected Impact:

 

 

 

Alternative Options:

The County could elect to approve or choose to reject the study recommendations. However, if not approved, the design plans cannot be completed as recommended in the study.

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/18/2022

22-6625

Approval to negotiate with AKV Consulting, LLC for Professional Engineering Services related to a Corridor Study for the Reconstruction of the Existing Roadway and Related Improvements along Market Street from Lakeside Drive to Magnolia Street, UPIN 23102MF2UQ01, Precinct 2.

08/08/2023

23-4538

Request for approval to execute an agreement with AKV Consultants, LLC in the amount of $407,395.42 for Professional Engineering and related services to provide a Corridor Study along Market Street from Lakeside Drive to Magnolia Street, UPIN 23102MF2UQ01, Precinct 2, MWDBE Contracted Goal 78%.

 

Location:

Address (if applicable): Market Street from Lakeside Drive to Magnolia Street

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/30/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E, CFM, Chief of Engineering and Architectural Services.

 

Attachments (if applicable): Study report