Legislation Details

File #: 25-5959    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 9/8/2025 In control: Commissioners Court
On agenda: 9/18/2025 Final action: 9/18/2025
Title: Request for approval on the basis of highest overall evaluation and authorize negotiations with HR Green, Inc. for professional engineering and support services for Helms Stormwater Detention basin and conveyance improvements for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree on an executable contract (250218), MWBE Contracted Goal: 16.18%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 250218

Vendor/Entity Legal Name (if applicable): HR Green, Inc.

 

MWBE Contracted Goal (if applicable): 16.18%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval on the basis of highest overall evaluation and authorize negotiations with HR Green, Inc. for professional engineering and support services for Helms Stormwater Detention basin and conveyance improvements for the Flood Control District, and the county, at its sole discretion, may discontinue negotiations and proceed to negotiate with the next ranking vendor(s) if unable to agree on an executable contract (250218), MWBE Contracted Goal: 16.18%.

end

 

Background and Discussion:

This is a request to authorize negotiation for an agreement that will provide final design, bidding and construction phase services for Helms Stormwater Detention Basin and Conveyance Improvements for the Harris County Flood Control District.

 

Expected Impact:

The Project seeks to reduce flooding risk in the Halls Bayou tributary P118-26-00 watershed by increasing stormwater conveyance and detention capacity in the tributary. The proposed conveyance improvements include converting the tributary channel into an enclosed system with reinforced concrete boxes.  The proposed stormwater detention basin improvements include expanding two existing wet-bottom stormwater detention basins and converting them to dry-bottom stormwater detention basins. The proposed improvements are estimated to remove 207 acres of land and benefit 58 structures in a 500-year pre-Atlas 14 storm event.

 

Alternative Options:

The alternative to approving this item would be to select another engineering firm, which would result in significant delays to completing this project. 

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): Choose an item.

Housing Initiative (Goal 6): Choose an item.

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

7/10/2025

184

Advertisement of project approved

 

Location: Halls Bayou Watershed, Harris County

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.3 – Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Rusty Lannin, Project Manager – Engineering Department, Flood Control District; Jared Abbey, Sr. Sourcing Manager – Office of the Purchasing Agent.

 

Attachments (if applicable): Letter