Legislation Details

File #: 25-5635    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/2/2025 In control: Commissioners Court
On agenda: 9/18/2025 Final action: 9/18/2025
Title: Request for approval of a change in contract with Reytec Construction Resources, Inc., in connection with final construction of Oak Glen Place Subdivision Drainage Improvements - 2018, with a deduction in the amount of $674,898.86, Job No. 23/0028-7, UPIN 19101MF13601, Precinct 2, MWBE Contracted Goal: 21%, MWBE Current Participation: 24%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Transmittal

 

Project ID (if applicable): Job No. 23/0028, UPIN 19101MF13601

Vendor/Entity Legal Name (if applicable): Reytec Construction Resources, Inc.

 

MWBE Contracted Goal (if applicable): 21%

MWBE Current Participation (if applicable): 24%

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Reytec Construction Resources, Inc., in connection with final construction of Oak Glen Place Subdivision Drainage Improvements - 2018, with a deduction in the amount of $674,898.86, Job No. 23/0028-7, UPIN 19101MF13601, Precinct 2, MWBE Contracted Goal: 21%, MWBE Current Participation: 24%.

end

 

Background and Discussion:

The location of the work is in the Oak Glen Place (East) subdivision in the Halls Bayou Watershed. The proposed improvements include installation of a new storm sewer system, driveways paving, widening, and regrading of existing roadside ditches, and construction of a new detention pond.

 

The change in contract includes the following:

 

The line items are adjusted to reconcile underrun quantities on the project for completion of the proposed scope of work.

 

  • The decrease of quantities on underrun line item numbers 3, 4, 5, 7, 8, 9, 10, 16, 18, 20, 22, 24, 26, 28, 29, 30, 31, 32, 33, 34, 36, 38, 40, 59, 62, 63, 64, 65, 66, 67, 68, 76, 77, 79, 82, 83, 84, 93, 94, 102, 103, 104, 105, 106, 107, 108, 109, 111, 112, 113, 114, 116, 117, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 135, 137, 138, 139, 140 and 146 for a deduction in the amount of $675,999.40.
  • Line item created to adjust change order error to line-item number 33 for an addition in the amount of $1,100.54.

 

The above deductions result in a net deduction in the amount of ($674,898.86).

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Oak Glen Place (East) subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be compensated for completing the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/04/2023

65 (23-2090)

Contract Award - Reytec Construction Resources, Inc.

10/31/2023

55 (23-6241)

Contract Amendment (23/0028-1) for additional funds and extension of project term

06/04/2024

61 (24-3340)

Contract Amendment (23/0028-2) for additional funds and extension of project term

09/19/2024

53 (24-5687)

Contract Amendment (23/0028-3) for additional funds and extension of project term

10/29/2024

47 (24-6614)

Contract Amendment (23/0028-4) with no change in the amount or extension of the project term

12/10/2024

97 (24-7491)

Contract Amendment (23/0028-5) with no change in the amount or extension of project term

04/10/2025

60 (25-2148)

Contract Amendment (23/0028-6) for extension of project term

04/10/2025

242 (25-2156

Transmittal – Substantial Completion Certificate

 

Location: Oak Glen Place Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

-$674,898.86

-$674,898.86

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$674,898.86

-$674,898.86

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$674,898.86

-$674,898.86

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): CIC – Change in Contract - FINAL