Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Utility Agreement
Project ID (if applicable): UPIN 24035MF3GS01
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 13212 ½ Will Clayton Parkway, Humble, Texas 77346 for electrical power serving a traffic signal at the intersection of Will Clayton Parkway at Tabor Brook Drive, UPIN 24035MF3GS01, Precinct 3.
end
Background and Discussion:
Installing a traffic signal at the intersection of Will Clayton Parkway at Tabor Brook Drive is a project that aims to enhanced traffic movements at the existing intersection. The service outlet location statement is needed to establish electrical service from CenterPoint Energy Houston Electric, LLC to power the traffic signal.
Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy Houston Electric, LLC to provide electrical service to the traffic signal, which is needed to enhance operations at the intersection Will Clayton Parkway at Tabor Brook Drive.
Alternative Options:
All traffic signals require a power source, which is typically obtained through CenterPoint Energy Houston Electric, LLC. Alternative options are to place a generator, which is not reliable, or to not install traffic signals at the intersection. Both options will negatively impact operations and increase delay of the intersection.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
08/06/2024 |
97 |
Request for approval to negotiate with Stevens Technical Services Inc to provide Professional Engineering Services. |
|
03/27/2025 |
78 |
Request for approval to execute an agreement with Stevens Technical Services Inc to provide Professional Engineering Services. |
Location:
Address (if applicable): 13212 ½ Will Clayton Parkway, Humble, Texas 77346
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Traffic Engineering and Operations |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
1000 - General Fund BUS.UNIT: HCNTY / FUND: 1000 / DEPT.: 10306000 /ACCOUNT: 619040 |
$0 |
$0 |
$0 |
$1,200.00 |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$0 |
$0 |
$0 |
$1,200.00 |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$0 |
$0 |
$0 |
$1,200.00 |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 10/16/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief, Engineering & Architectural Services, OCE
Attachments (if applicable): SOLS