Legislation Details

File #: 25-6225    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/1/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of change in contract No. 2 with A Morfin Trucking, LLC, for the Yale Stormwater Detention Basin, resulting in an addition of $25,910.13 to the contract amount (White Oak Bayou Watershed, Bond ID F-09, Project ID E501-03-00-E001, Job No. 24/0350, Precinct 2, MWBE Contracted Goal: 13.35%, MWBE Current Participation: 48.21%).

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): E501-03-00-E001

Vendor/Entity Legal Name (if applicable): A Morfin Trucking, LLC

 

MWBE Contracted Goal (if applicable): 13.35%

MWBE Current Participation (if applicable): 48.21%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of change in contract No. 2 with A Morfin Trucking, LLC, for the Yale Stormwater Detention Basin, resulting in an addition of $25,910.13 to the contract amount (White Oak Bayou Watershed, Bond ID F-09, Project ID E501-03-00-E001, Job No. 24/0350, Precinct 2, MWBE Contracted Goal: 13.35%, MWBE Current Participation: 48.21%).

end

 

Background and Discussion:

This change in contract is needed to complete the construction scope for this project. The Yale Stormwater Detention Basin project includes a wet bottom detention basin with an inflow side weir and flap gate outfall pipe, adjacent to E101-00-00 (Little White Oak Bayou). The Project is located southeast of the intersection at W. Tidwell Road and Yale Street, in the White Oak Bayou Watershed. The purpose of this contract change is to reconcile estimated quantities with actual project requirements. The change increases the underestimated quantities for Remove and Dispose of Concrete Rubble and Structures (02120-03), All Pipes (02120-04), and Driveways and Sidewalks (02120-26). Additionally, the quantity of Concrete Box Inlets (02632-50), which are no longer required for construction, is being deducted to offset the associated cost.

 

Expected Impact:

This change will allow the contractor to construct the project so that Harris County can realize intended flood risk reduction benefits. 

 

Alternative Options:

This is an active construction contract, so there are not many alternatives to approving a change order other than cancelling the contract, which is not recommended as doing so would substantially delay the remaining work in the construction contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

409.

Advertisement

12/10/2024

352.

Award

05/22/2025

96.

Change in Contract No. 1

 

Location:

Address (if applicable): 161 West Tidwell Road, Houston, Texas

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.2 - Construction Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$25,910.13

$25,910.13

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$25,910.13

$25,910.13

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$25,910.13

$25,910.13

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Change in Contract and Map