Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0363, UPIN 22102MF24Y01
Vendor/Entity Legal Name (if applicable): Precise Services, Inc.
MWBE Contracted Goal (if applicable): 28.87%
MWBE Current Participation (if applicable): 100.00%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
...title
Request for approval of a change in contract with Precise Services, Inc., in connection with the construction of Roadway - South Sheldon at Market Street Intersection and Related Drainage Improvements 2021, adding 26 calendar days, with an addition in the amount of $169,669.00, Job No. 25/0363-1, UPIN 22102MF24Y01, Precinct 2, MWBE Contracted Goal: 28.87%, MWBE Current Participation: 100%.
...end
Background and Discussion:
This project is part of Precinct 2 REVIVE2THRIVE to enhance drivability and provide a safe driving environment along Harris County. The project consists of reconstruction of approximately 18,600 SY 10” thick reinforced concrete roadway with new traffic signals, and construction of approximately 2,000 LF of concrete sidewalk, and approximately 4,700 LF of storm sewer pipes.
PCO#1 - This change order is necessary to address unforeseen underground utility conflicts involving existing 4-inch gravity sanitary sewer lines and a waterline interfering with the proposed storm sewer improvements along Market Street. Due to limited space within the utility corridor, the need to maintain uninterrupted sanitary sewer service, and the inability to adjust existing flowline elevations, conventional utility adjustments are not feasible. Following field coordination, the installation of six conflict manholes, 8-inch steel casing for sanitary sewer crossings, and 12-inch steel casing for the waterline conflict was determined necessary to accommodate the existing utilities and allow construction to proceed. The change also addresses previously manufactured precast structures rendered unusable by the revised storm sewer lateral alignment. Adding $169,669.00 with 26 calendar days to the contract.
Expected Impact:
This action allows for the completion of the project as designed and per the contract documents and the Contractor to be compensated for the actual work performed.
Alternative Options:
Continue with the original plan.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
02/26/2026 |
179 (26-1381) |
Contract Award |
Location:
Address (if applicable):
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
1070 - Mobility Fund |
$ |
$169,669.00 |
$169,669.00 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$169,669.00 |
$169,669.00 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$169,669.00 |
$169,669.00 |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 12/3/2026
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): County Auditor’s Form 1258B-