Legislation Details

File #: 26-7822    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/13/2026 In control: Commissioners Court
On agenda: 12/3/2026 Final action:
Title: Request for approval of a change in contract with Precise Services, Inc., in connection with the construction of Roadway - South Sheldon at Market Street Intersection and Related Drainage Improvements 2021, adding 26 calendar days, with an addition in the amount of $169,669.00, Job No. 25/0363-1, UPIN 22102MF24Y01, Precinct 2, MWBE Contracted Goal: 28.87%, MWBE Current Participation: 100%.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 25/0363, UPIN 22102MF24Y01

Vendor/Entity Legal Name (if applicable): Precise Services, Inc.

 

MWBE Contracted Goal (if applicable): 28.87%

MWBE Current Participation (if applicable): 100.00%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

...title

Request for approval of a change in contract with Precise Services, Inc., in connection with the construction of Roadway - South Sheldon at Market Street Intersection and Related Drainage Improvements 2021, adding 26 calendar days, with an addition in the amount of $169,669.00, Job No. 25/0363-1, UPIN 22102MF24Y01, Precinct 2, MWBE Contracted Goal: 28.87%, MWBE Current Participation: 100%.

...end

 

Background and Discussion:

This project is part of Precinct 2 REVIVE2THRIVE to enhance drivability and provide a safe driving environment along Harris County.  The project consists of reconstruction of approximately 18,600 SY 10” thick reinforced concrete roadway with new traffic signals, and construction of approximately 2,000 LF of concrete sidewalk, and approximately 4,700 LF of storm sewer pipes.

 

PCO#1 - This change order is necessary to address unforeseen underground utility conflicts involving existing 4-inch gravity sanitary sewer lines and a waterline interfering with the proposed storm sewer improvements along Market Street.  Due to limited space within the utility corridor, the need to maintain uninterrupted sanitary sewer service, and the inability to adjust existing flowline elevations, conventional utility adjustments are not feasible.  Following field coordination, the installation of six conflict manholes, 8-inch steel casing for sanitary sewer crossings, and 12-inch steel casing for the waterline conflict was determined necessary to accommodate the existing utilities and allow construction to proceed.  The change also addresses previously manufactured precast structures rendered unusable by the revised storm sewer lateral alignment.  Adding $169,669.00 with 26 calendar days to the contract.

 

Expected Impact:

This action allows for the completion of the project as designed and per the contract documents and the Contractor to be compensated for the actual work performed.

 

Alternative Options:

Continue with the original plan.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/26/2026

179 (26-1381)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$169,669.00

$169,669.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$169,669.00

$169,669.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$169,669.00

$169,669.00

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B-