Legislation Details

File #: 25-1563    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/11/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval of a change in contract with MC2 Civil, LLC in connection with construction of Treaschwig Road A (Phase 1) - from 1,000' West of Aldine Westfield Road to West of Cypress Creek - 2014, adding 152 calendar days, with an addition in the amount of $182,900.29, Job No. 23/0420-1, UPIN 14104MF08X01, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 23.53%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0420, UPIN 14104MF08X01

Vendor/Entity Legal Name (if applicable): Main Lane Industries, LLC

 

MWBE Contracted Goal (if applicable): 27%

MWBE Current Participation (if applicable): 23.53%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with MC2 Civil, LLC in connection with construction of Treaschwig Road A (Phase 1) - from 1,000' West of Aldine Westfield Road to West of Cypress Creek - 2014, adding 152 calendar days, with an addition in the amount of $182,900.29, Job No. 23/0420-1, UPIN 14104MF08X01, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 23.53%.

end

 

Background and Discussion:

The project consists of construction of Treaschwig Road Segment A Phase 1 project consists of reconstruction and widening of Treaschwig Road from a 2-lane asphalt to a 4-lane concrete roadway from 1000’ west of Aldine Westfield to west of Cypress Creek.  Additionally, extend intersection improvements at Aldine Westfield by 500’ North and South of Treaschwig Road.  Project will construct a wet bottom detention pond adjacent to Cypress Creek.


This change in contracts includes:

 

•                     Change includes cost and time for EZ fiber conflict delay ($287,883.68 - 3 days).

 

•                     Cost of adding new bid item for additional clearing for installation of outfall at detention basin ($9,376.61).  

 

•                     Cost includes quantity adjustment for profile modification requested by Precinct 3 to avoid potential private fences and gates relocation along the Right-of-Way (-$114,360.00).

 

 

Expected Impact:

Change allows the contractor to be compensated for delay caused by utility conflict, paid for extra clearing for installation of outfall and quantity adjustments for profile modification.

 

Alternative Options:

 

Had the utility owner to relocate their line before construction started, install the proposed inlets and leads per original plan which would cause extra cost of relocation of fences and gates.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/19/2023

280 (23-7464)

Contract Award

 

Location:

Address (if applicable): Treaschwig Road

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

$182,900.29

$182,900.29

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$182,900.29

$182,900.29

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$182,900.29

$182,900.29

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B