Legislation Details

File #: 25-1570    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 3/11/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval to execute an agreement with Bowman Engineering & Consulting, Inc. in the amount of $1,514,785 for Professional Engineering Services in connection with Peek Road - from Stockdick School Road to Beckendorff Road - 2023 project, UPIN 24104MF3A401, Precinct 4, MWBE Contracted Goal: 19.60%.
Sponsors: Mony Hossain
Attachments: 1. 25-1570-UPIN 24104MF3A401-Bowman Engineering -Peek Rd Stockdick Beckendorff- 03272025.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Commissioner Lesley Briones

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 24104MF3A401

Vendor/Entity Legal Name (if applicable): Bowman Engineering & Consulting Inc.

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Personal Services Agreement

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Bowman Engineering & Consulting, Inc. in the amount of $1,514,785 for Professional Engineering Services in connection with Peek Road - from Stockdick School Road to Beckendorff Road - 2023 project, UPIN 24104MF3A401, Precinct 4, MWBE Contracted Goal: 19.60%.

end

 

Background and Discussion:

Precinct 4 has requested that the Office of the County Engineering manage the Study and Design of the Peek Road - from Stockdick School Road to Beckendorff Road - 2023 project. Peek Road is an existing 2-lane asphalt road with roadside ditches and bridge crossing over South Mayde Creek. The project proposes to improve the existing conditions to a 4-lane concrete boulevard with medians, underground storm sewer, sidewalks and expanded bridge crossing.

 

Expected Impact:

The project seeks to improve transportation and pedestrian mobility by improving the road conditions to enhance traffic flow and provide pedestrian friendly infrastructure by constructing sidewalks.

 

Alternative Options:

The County could elect to not approve this request; however, the consultant would not be able to complete the scope of work.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

4/23/2024

142

Request for approval to negotiate with Bowman Engineering & Consulting for Professional Engineering Services for the study and design of the Peek Road - Stockdick School Road to Beckendorff Road project, UPIN 24104MF3A401, Precinct 4.

 

Location: Precinct 4

Address (if applicable): Peek Road from Stockdick School Rd to Beckendorff Rd

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Professional Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds 2015 Road Bond

$

$1,514,785

$1,514,785

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,514,785

$1,514,785

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,514,785

$1,514,785

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Professional Services Agreement