Legislation Details

File #: 25-7548    Version: 1 Name:
Type: Financial Authorization Status: Passed
File created: 11/20/2025 In control: Commissioners Court
On agenda: 12/11/2025 Final action: 12/11/2025
Title: Request for approval of an amendment and renewal of the agreement with BNSF Railway Company to account for the inflationary cost increase of $404,601 from the original agreement, in connection with the proposed widening of the existing Hufsmith-Kohrville Road at-grade crossing, UPIN 15104M23NP03, Precinct 3.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom Ramsey, P.E.

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Financial Authorization

 

Project ID (if applicable): 15104M23NP03

Vendor/Entity Legal Name (if applicable): BNSF RAILWAY COMPANY

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal:
  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment and renewal of the agreement with BNSF Railway Company to account for the inflationary cost increase of $404,601 from the original agreement, in connection with the proposed widening of the existing Hufsmith-Kohrville Road at-grade crossing, UPIN 15104M23NP03, Precinct 3.

end

 

Background and Discussion:

The Hufsmith-Kohrville Road Segment 3A project includes roadway widening and associated railroad crossing improvements. The original agreement with BNSF Railway Company covered design review, inspection, and construction costs based on 2021 rates.

In 2021, at the time of the initial agreement (approved on April 27, 2021), the total project cost approved by BNSF was $935,496. Due to revised rates and inflation adjustments, the current total cost in 2025 has increased to $1,340,097, resulting in an amendment amount difference of $404,601. Since that time, BNSF has updated its cost schedule to reflect current labor, materials, and administrative expenses. This amendment aligns the County’s agreement with the revised 2025 cost structure, ensuring continued coordination and compliance with BNSF’s construction and safety requirements for the at-grade crossing improvements.

 




Expected Impact:

Approval of this amendment will allow BNSF Railway Company to proceed with construction coordination and implementation of the crossing improvements necessary to accommodate the widening of Hufsmith-Kohrville Road, ensuring schedule continuity and safety compliance.

Alternative Options:

If no action is taken, the project may experience construction delays, there will be a rail gap at the utility easement, and the intended objective will not be achieved.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

4/27/2021

55

Grade crossing construction and Maintenance agreement.

 

Location: Hufsmith-Kohrville Road

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$404,601.00

$404,601.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$404,601.00

$404,601.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$404,601.00

$404,601.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/11/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services

Office of the County Engineer

 

Attachments (if applicable): Grade Crossing Construction and Maintenance agreement - Combined.