Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 21/0340, UPIN 2201MF2E201
Vendor/Entity Legal Name (if applicable): DL Glover, Inc.
MWBE Contracted Goal (if applicable): 10%
MWBE Current Participation (if applicable): 10.25%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with DL Glover, Inc., in connection with final construction of On-Call - Maintenance Ditch Regrading, Precinct 1 - 2021, with an addition in the amount of $134,747.30, Job No. 21/0340-1, UPIN 22101MF2E201, Precinct 1, MWBE Contracted Goal: 10%, MWBE Current Participation: 10.25%.
end
Background and Discussion:
Project includes the maintenance of regrading existing roadside ditches at various locations throughout Precinct 1. The change in contract adds $134,747.30 to the contract amount, compensating the Contractor for the list of work orders completed within the term of this contract. This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. At the request of the Precinct this purchase order is being closed.
Expected Impact:
Change allows Contractor to complete the requested work orders within the Precinct 1 limits.
Alternative Options:
Maintain the original scope of the project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
12/14/2021 |
205 (21-6641) |
Contract Award |
|
04/04/2023 |
251 (23-1979) |
Contract Renewal |
|
09/19/2023 |
91 (23-5348) |
Contract Amendment to deduct funds from the contract |
|
03/26/2024 |
668 (24-2013) |
Contract Renewal |
|
10/08/2024 |
54 (24-6073) |
Contract Amendment to deduct funds from the contract |
|
03/27/2025 |
362 (25-1931) |
Contract Renewal |
|
03/19/2026 |
207 (26-1763) |
Contract Renewal |
Location: Precinct 1
Address (if applicable):
Precinct(s): Precinct 1
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
1070 - Mobility Fund 3109 |
$ |
$134,747.30 |
$134,747.30 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$134,747.30 |
$134,747.30 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$134,747.30 |
$134,747.30 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 6/11/2026
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): County Auditor’s Form 1258B